Renovation of a clubhouse / community center in Farmingdale, New York. Completed plans call for the renovation of a clubhouse / community center.

In accordance with State Finance Law, Section 139-j, the following agency staff have been designated as contacts for this contract. Question Deadline 10/01/2024 at 10:00 AM ET All Requests For Information (RFIs) are RFIs received after this due date and time will not be processed. For all technical questions - Utilize the contacts noted below: (Please email everyone) Project Specific Liquidated Damages (Refer to Article 14.10 of the General Conditions). In the event the Contractor fails to complete all the work on time, the Contractor agrees to pay the Office liquidated damages in the amount referenced in Article 14.10 of the General Conditions. Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by a scanned Bid Security in the form of a certified check, bank check, or bid bond in the amount of: $10,250.00 (Ten Thousand Two Hundred Fifty Dollars and Zero Cents) The successful bidder will be required to furnish a Performance Bond and a Labor and Material Bond/Payment Bond in the statutory form of public bonds required by Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract. Question Deadline 10/01/2024 at 10:00 AM ET All Requests For Information (RFIs) are RFIs received after this due date and time will not be processed. For all technical questions - Utilize the contacts noted below: (Please email everyone). Ms. Margaret Ziminski/ Ms. Tiffany Willms 631-321-3544 LIEngineeringContracts@parks.ny.gov Minority Owned Sub-Contracting Goal: 10% Women Owned Sub-Contracting Goal: 20% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Project Completion The completion date for this project is 120 days after agreement has been approved by the NYS Comptroller's Office. Substantial completion by April 30, 2025 Location: Bethpage State Park Public Building Law 8(6) Pursuant to Public Building Law 8(6), Any Contracts Over $5,000 for the Work of Construction, Reconstruction, Alteration, Repair, or Improvement of Any State Building, a Responsible and Reliable Nys-certified Minority or Women-owned Business Enterprise That Submits a Bid Within Ten Percent of the Lowest Bid Will Be Deemed the Apparent Low Bidder Provided That the Bid is $1,628,283 or Less (Maximum Amount Has Been Adjusted for Inflation Effective January 1, 2024). If More Than One Responsible and Reliable Mwbe Firm Meets the Requirements, the Mwbe Firm With Lowest Bid Will Be Deemed the Apparent Low Bidder. General Construction Contract: D006325 The scope of work includes but is not limited to: full exterior cleaning using approved methods, scraping, sanding and repainting all existing painted surfaces, siding replacement on dormers, areas of limited siding repair, gutter repairs, and brick masonry repairs. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Estimated Range: $254,592.32 - $344,448.43 Evaluate, accept and/or reject any and all bids, in whole or in part, and to waive technicalities, irregularities, and omissions if, in OPRHP's judgement, the best interests of OPRHP will be served. In the event compliant bids are not received, OPRHP reserves the right to consider late or non-conforming bids

Bid Results

Clubhouse / Community Centers

$179,250.00

Public - State/Provincial

Renovation

15

16

2

4

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Joists, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Steep Slope Roofing, Shingles and Shakes, Roof and Wall Specialties and Accessories, Roof Accessories
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Wood Flooring, Carpeting, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture
Division 26 - Electrical

Division 26 - Electrical

Electrical and Cathodic Protection, Facility Lightning Protection
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Fill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting

Find More Local Projects

Within 75 Miles of This Project
496
Active Projects
275
Bidding Soon
4,524
All Active Projects
2,073
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2024

November 7, 2024

img_map_placeholder

99 Quaker Meeting House Rd, Farmingdale, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Clubhouse Exterior Restorations

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.