EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 10, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Shirley Ctr, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Installation of guardrail along existing shared-use path on Front Street from Hospital Road to about 200 feet past the middle school driveway exit on Front Street. Installation of new curb and shared-use path construction on the North side of Front Street from Patterson Road to Walker Road. Crosswalk reconstruction at the intersection of Front Street and Patterson Road. Application of thermoplastic pavement markings along Front Street from Patterson Road to Walker Road. Change-in-type of existing catch basins and installation of new catch basin on the North side of Front Street from Patterson Road to Walker Road. Contractor Qualification Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Docs notes ; contract documents will be made available electronically. Requests can be made via email to Christopher Lyman at clyman@hshassoc.com Contractors should email questions and addendum acknowledgements to the following email address clyman@hshassoc.com Question Deadline 10/09/2024 at 4:00 PM ET

Post-Bid

Roads / Highways

$547,405.00

Public - City

Paving, Site Work

49

5

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
393
Active Projects
232
Bidding Soon
3,255
All Active Projects
1,531
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2024

November 15, 2024

img_map_placeholder

Multiple Locations, Shirley Ctr, MA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Front Street Complete Streets Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.