Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 7, 2024 at 8:00 PM
Updated October 8, 2024
This is a service / maintenance or supply contract in Cloquet, Minnesota. Contact the soliciting agency for additional information.
Location Details Site Address: 2101 14th Street City: Cloquet County: Carlton State/Province: MN Request Description Request Category Code: Architectural/Engineering Services (RFP/RFQ) Description: The Minnesota State Board of Trustees, on behalf of Fond du Lac Tribal and Community College hereafter referred to as the "Owner", is soliciting proposals from interested, qualified consultants, and intends to retain a professional consulting firm, hereafter referred to as the "A/E", to develop a new Comprehensive Facilities Plan and Utility Master Plan, hereafter referred to as the "CFP" and "UMP". This RFP is undertaken by Fond du Lac Tribal and Community College pursuant to the authority contained in provisions of Minnesota Statutes 136F.581 and other applicable laws. The Minnesota State Board of Trustees requires all colleges and universities within the system to maintain and regularly update their campus Comprehensive Facilities Plan (CFP) to ensure short, mid, and long-term planning of campus facilities. Campus development, siting of new buildings and structures, and renovation, repair and renewal of existing facilities shall be consistent with the most current Comprehensive Facilities Plan. With the current pressures placed upon higher education and its facilities, comprehensive facilities planning has become more critical than ever. The system's overarching goal for campus comprehensive facilities planning is to provide the campus a framework to align its financial, physical, and academic resources to best deliver higher education to its students. The colleges and universities of Minnesota State use their current Comprehensive Facilities Plans when: o Developing projects for a capital budget request o Evaluating and improving space utilization o Acquiring or selling real estate o Prioritizing repair and replacement needs, and o Identifying or removing obsolete space. The utility master planning process develops a road map to ensure that utility systems can reliably and efficiently serve the campus's current and future service needs. The process includes evaluating existing utility system conditions, understanding future service needs, evaluating options for meeting these future needs, and articulating an implementation plan that can guide capital investment projects. This process can help campuses: o determine the capability of existing utility systems to serve future needs o determine efficient and cost-effective ways to meet expected campus needs o determine the magnitude, cost, and timing of needed campus utility projects o develop institutional support for needed projects o create a capital investment plan for needed improvements to the campus utility infrastructure and build resilience to future events The scope of utility master planning efforts at Minnesota State colleges and universities will vary based on campus needs. Each Utility Master Plan will provide a broad overview of each service provided to the campus - including electrical power, heating, cooling, gas, domestic water, fire water, irrigation, sanitary sewer, storm sewer, compressed air, and standby/emergency generation systems. Additionally, each campus will identify systems that would benefit from an in-depth analysis. Primary Contact Information Owner Details Owner Name: Minnesota State Address: 2101 14th Street, Cloquet, MN - 55720 Contact: Bret Busakowski Email: bret.busakowski@fdltcc.edu Solicitor Details Solicitor Name: Minnesota State Design Discipline: Owner Address: Wells Fargo Place, 30 Seventh Street East, Suite 350, St Paul, MN - 55101 Phone: 651-448-7285 Contact: Capital Planning & Analysis Email: karen.huiett@minnstate.edu For questions or assistance, contact at 952-233-1632 for assistance with viewing, downloading, submitting qualifications for this digital project information.
Conceptual
Water / Sewer
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 9, 2025
Multiple Locations, Cloquet, MN
Related To This Project
Cloquet, MN
Bid Date: Dec 17 2024
Cloquet, MN
Bid Date: Dec 19 2024
Cloquet, MN
Bid Date: Feb 18 2025
Cloquet, MN
Bid Date: Feb 24 2025
Cloquet, MN
Bid Date: Feb 18 2025
Cloquet, MN
Bid Date: Feb 20 2025
Cloquet, MN
Bid Date: Apr 12 2019
Cloquet, MN
Bid Date: Mar 20 2025
Cloquet, MN
Bid Date: Sep 25 2024
Cloquet, MN
--
Cloquet, MN
Bid Date: Jan 28 2026
Cloquet, MN
--
Cloquet, MN
--
Cloquet, MN
Bid Date: May 07 2024
Cloquet, MN
Bid Date: May 14 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
