BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Odessa, Florida. Contact the soliciting agency for additional information.

The Work in includes furnishing all labor, materials, tools, and equipment for Excavation, removal and disposing of leftover material, and furnishing and placing off-site fill. Sludge Removal Removal of up to 9,999 CY of dry sludge from pond. Estimated removal per day: 400-500 CY Supervision, manpower, equipment, hauling, and disposal included. The City of St. Petersburg (COSP) will be responsible for Excavating Permit. All other Permits such as Hauling Permit will be the responsibility of the Contractor. Question Deadline 10/01/2024 at 12:00 PM ET All questions must be submitted via City's online sourcing system The City of St. Petersburg is seeking responses from qualified vendors to provide Excavating, Hauling and Disposal of lime sludge removal from the Cosme Water Treatment Plant located at 16015 Race Track Rd. Odessa, FL 33556. The initial request will be for a project to remove 9,999 Cubic Yards from the Sludge Lagoon, but will be on-going on an as needed basis for initial term. 4.2. Term The initial term of this contract will be for three (3) years from the date of contract execution with a mutually agreed second term not to exceed three (3) years. 4.3. Vendor Requirements Potential bidders shall consider all applicable regulatory requirements, industry standards, best practices regarding past professional experience in their responses to this bid. A. The work under this contract will require the contractor to and remove and dispose of all lime sludge from the City's Water Plant. Sludge removal will be performed in accordance with all rules and regulations promulgated by D.E.P., D.N.R.P. and all other Federal, State and local regulating agencies which govern these activities. B. Vendor shall have the expertise to perform the services required by these specifications. C. Vendor shall be responsible for payment of any and all dumping fees and/or permits required (Except Excavation Permit). D. Vendor must submit at least three business references including the contact person and telephone numbers to show reliability of operational experience. E. Removal will be required after the sludge has been allowed to dry for a minimum of seven (7) days, except for major rains or similar acts of God. F. The vendor's operations as to the frequency of removal shall be agreed upon beforehand and subject to approval of the Water Plant Chief Operator or his designee. G. The entire Water Plant site falls under wellfield protection rules and the contractor shall conduct his operations in a manner which will prevent any ground contamination with diesel fuel, hydraulic fluid or any other substance whose presence or contact with the ground by spill, leakage, etc. would be detrimental in any way to the treatment process or wellfields or in contravention with established regulations governing such activity. H. All invoicing will require supervisor or designee approval of loads slips or other verifiable means of removal. I. All sludge removed by truckload will be verified by the Senior Plant Maintenance Coordinator or his designee. J. There will be no separate or direct payment to the contractor for mobilization or demobilization of equipment. K. Operations within or mandated requirements pursuant to this contract, the City reserves the right to cancel and/or invalidate the contract for lack of performance on the part of the contractor. Notice to this effect shall be tendered not to exceed seven (7) days. L. Lime Sludge will be hauled from designated locations to approved disposal site(s). M. All permit requirements ( Excluding Excavation Permit)will be the responsibility of the vendor and he shall be responsible for supplying all equipment, materials, and manpower necessary for the excavation, loading, transporting and disposal of the lime sludge. N. The vendor will be responsible for payment of all dumping charges. O. Any damage to plant piping, valves or any equipment associated with the polishing pond, shall be repaired by the contractor at no cost to the City. P. Vendor shall agree that each vehicle used for the hauling of lime sludge from the City shall undergo a vehicle certification process to verify the capacity of the dump bed of each vehicle. Contractor shall notify City at least forty-eight (48) hours in advance of being on-site with trucks, in order to arrange for City personnel to be available to perform the certification process when a non-certified vehicle is to be used. Once a vehicle has been certified by the City, there will be no further need to request additional certification for the vehicle, unless there is mechanical alteration to the vehicle dump bed, in which case, the vehicle dump bed capacity must be re-certified. Q. Vendor and an authorized representative of the City will inspect each loaded vehicle, and mutually agree upon the number of cubic yards of material contained in each vehicle dump bed. Upon agreement, that amount shall be documented in writing, and the Contractor shall invoice the City for only the number of cubic yards contained in the vehicle dump bed as agreed upon and documented for that specific load. 4.4. Minimum Qualifications At a minimum, Vendor must meet the following qualifications: Have been in the business of providing lime-sludge removal and disposal services as described herein for a minimum of three years. Own or have immediate access to the equipment required to provide services. If subcontractor(s) are to be utilized, provide a detailed list including the company name, type of work they will perform, what equipment they will be providing, and % of the overall job they will complete. Have the ability to obtain the minimum insurance requirements set forth in this Agreement 4.5. Contractor Responsibilities A. Contractor shall provide a single point of contact to administer the Agreement. If this person isn't your on-site project manager, you will be required to name an on-site manager/supervisor that will be available at all times while the job is in progress. Contractor will need to provide after hour phone numbers for emergency contact. B. Contractor shall obtain all applicable State, County and Local Licenses, Permits necessary excluding Excavating, and shall adhere to all requirements. It will be the Contractors responsibility to know the requirements and follow them. All fees for Permits or Licenses will be the responsibility of the contractor. C. Contractor is responsible for all fees related to the disposing of lime sludge and all other waste materials generated during the contract. D. Contractor shall submit a plan to prevent the entry of any accidental spillage of any materials or any discharge into the stormwater drain system or basin. The plan shall include any materials from the tanks, equipment, fuel, oil and any reportable spill. Any spill shall be the responsibility of the contractor. E. Contractor shall take pictures of the plant site before work begins and restore any damage to the site caused from the work performed on this project. 4.6. City's Responsibilties A. City shall provide a single point of contact (Project Manager) to administer the Agreement. Project Manager or his designee will respond to any inquiries in a timely manner as to not hinder the progress of the project. B. City Project Manager shall assist with planning, strategy and objectives prior to performance of the Work. C. The City will provide access to the work area. The Plant is manned and has locked gates. The City will provide personnel to man the gates and give the contractor access to the plant. D. The City will provide uninterrupted access to the site for all equipment and personnel necessary for contractor to perform the work. E. City will be responsible for Excavating Permit. 4.7. Working Schedule Contractor shall provide services during regular business hours, 7:00 a.m. to 4:30 p.m., Monday through Friday, excluding city holidays. 4.8. Safety Contractor shall be responsible for ensuring that Contractor's staff follow all established safety regulations pertaining to the work to be performed per OSHA and/or City standards.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
49
Bidding Soon
965
All Active Projects
392
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

November 25, 2024

img_map_placeholder

16015 Race Track Rd, Odessa, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.