Site work and paving for a mixed-use development in Clinton Township, Michigan. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000363378 In order to provide Clinton Township with contractors and subcontractors who will carry out the work in a timely and satisfactory manner, an approved prequalification for the following categories must be on file with the Township prior to the bid opening. Water main Replacement & Construction in an existing residential or commercially developed area. Horizontal Directional Drilling for water main or low-pressure sewers The Work is generally described as follows: Water main replacement, including new water main valves and services, and pavement removal, replacement, and restoration. The approximate primary quantities involved in this work are as follows: Sidewalk, Rem - 302 Syd Sidewalk, Conc, 4 inch - 2,417 Sft Gate Valve, 8 inch - 1 Ea Gate Valve and Box, 6 inch - 1 Ea Gate Valve and Box, 8 inch - 3 Ea Gate Valve and Box, 12 inch - 7 Ea Hydrant, Rem - 2 Ea Water Main, Fusible PVC (C-900 DR 14), 8 inch, Directional Drilled - 339 Ft Water Main, Fusible PVC (C-900 DR 14), 12 inch, Directional Drilled - 2560 Ft Water Main, C-900 DR 14, 6 inch, Tr Det G - 17 Ft Water Main, C-900 DR 14, 8 inch, Tr Det G - 6 Ft Water Main, C-900 DR 14, 8 inch, Tr Det F - 10 Ft Water Main, C-900 DR 14, 12 inch, Tr Det G -155 Ft Water Main, Abandon, 6 inch - 15 Ft Water Main, Abandon, 8 inch - 97 Ft Water Main, Abandon, 12 inch - 2,737 Ft Fire Hydrant Assembly - 5 Ea Water Serv - 37 Ea Water Main Connection, 6 inch - 2 Ea Water Main Connection, 12 inch - 5 Ea HMA Surface, Rem - 89 Syd Pavt, Rem - 226 Syd HMA, 5EML - 15 Ton HMA, 4EML - 15 Ton HMA, 2EML - 30 Ton Aggregate Base, 6 inch - 312 Syd Conc, Pavt with Integral Curb, Nonreinf, 8 inch - 142 Syd Conc, Pavt with Integral Curb, Nonreinf, 9 inch - 60 Syd Conc, Pavt, Nonreinf, 6 inch - 36 Syd Live Tap, 8 inch by 12 inch - 1 Ea Tapping Well, 60 inch dia - 1 Ea This primary work shall be included together with related work as well as restoration. The project Bid Form will include all unit price bid items for this project. The project shall commence immediately following a notice to proceed per these contract documents. This project shall be substantially completed by May 31, 2025. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Labor and Materials Bond 100 % -- Bids must be submitted on the forms furnished by the Township Clerk or the Township Engineers in a sealed envelope marked: A certified check, bank draft, or satisfactory bid bond, executed by the bidder and a surety company, payable to Clinton Township, in an amount at least equal to five percent (5%) of the bid amount, shall be submitted with each bid.The accepted bidder shall be required to furnish a satisfactory Performance Bond, and Labor and Material Bond in the amount of 100% of the Contract Price, and Maintenance and Guarantee Bond of 100% for two years of the Final Contract Price. The cost of the bonds and insurance will be paid by the accepted bidder as an incidental cost to the project. General Requirements - Bidder Prequalification/Preregistration Required - Insurance Required Question Deadline 09/30/2024 at 1:00 PM ET Questions are submitted online No -- Please contact Scott J. Chabot, PE at (586) 726-1234 for any specific questions regarding the bidding documents. No Bid may be withdrawn for a period of sixty (60) calendar days after receipt of bids. *The Charter Township of Clinton reserves the right to accept or reject any or all bids

Award

Water / Sewer

$1,075,135.00

Public - City

Paving, Site Work

18

24

17

4

Subscribe For Documents

87 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
113
Bidding Soon
1,553
All Active Projects
645
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2024

November 4, 2024

img_map_placeholder

E 14 Mile Rd, Clinton Township, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.