BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2026 at 8:00 PM

Updated April 1, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Hanover, New Mexico. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This notice is issued to determine interest and capability among qualified small business prime contractors for a future bridge construction solicitation and to assess the potential for a socioeconomic set-aside. The work consists of reconstruction of three bridges and replacement of one concrete box culvert, including demolition of existing structures and construction of new simple-span, precast, prestressed concrete bridges. The scope includes an 80-foot simple span bridge utilizing precast prestressed I-girders with a cast-in-place reinforced concrete deck, a 55-foot-6-inch skewed simple span bridge using precast prestressed voided slabs with a cast-in-place concrete overlay, and a 36-foot simple span bridge using precast prestressed voided slabs with a cast-in-place concrete overlay. An optional work item includes removal of an existing open-bottom concrete box culvert and replacement with a 10-foot by 5-foot reinforced concrete box culvert. Additional work involves drilled shafts, structural concrete placement, epoxy-coated reinforcing steel, bridge rail installation, traffic control services, and associated roadway and bridge construction activities. Construction must account for work in cultural and natural resource sensitive areas with environmental constraints and cold-weather considerations to maintain material quality. The total estimated project cost is between $10 million and $20 million, with construction anticipated to occur from December 2026 through December 2027. Location: Grant County, New Mexico, along State Route 35 near Mimbres, including multiple bridge and culvert sites between milepost 0.5 and milepost 8.42. The Method of Contractor Selection has not been determined at this Time.

Conceptual

Bridges / Tunnels

$20,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
41
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.