EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 9, 2025 at 7:00 PM

Updated October 1, 2024

Demolition, site work, renovation and addition to an educational facility in Brodheadsville, Pennsylvania. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Additions and Renovations to Pleasant Valley High School. Construction Will Be Bid for the Following Prime Contracts: Contract No. 1: General Construction Contract No. 2: Hvac Construction Contract No. 3: Electrical Construction Contract No. 4: Plumbing Construction Contract No. 5: Environmental Abatement the Project Architect for Contracts 1 -4 is Kcba Architects, 8 E Broad St., Hatfield, Pa 19440, Phone: 215-368-5806. Document notes. Bidders must supply the following information with their request for documents: the contract(s) you are bidding on, company name, contact person, complete address, phone and cellular numbers, and email address. Documents will be available Monday, September 30,2024. Contracts 5: To bid the Project, prospective bidders must obtain the Contract Documents in PDF format directly from CHA, (deiQchasolutions. com) upon request, accompanied by a non-refundable fee of fifty dollars ($50.00). Checks shall be made payable to 'CHA.' Documents will be sent electronically after receipt of payment. Bidders must supply the following information with their request for documents: the contract(s) you are bidding on, company name, contact person, complete address, phone and cellular numbers, and email address. Documents will be available Monday, September 30,2024. The Project Construction Manager is CHA, 1 East Broad Street, Suite 310, Bethlehem, PA 18018, Phone: 610-865-3000. The Project Environmental Consultant and Designerfor Contract 5 is Element Environmental, 61 Willow Street, PO Box 921, Adamstown, PA 19501, Phone: 717-484-5111. The Project Construction Manager is CHA, 1 East Broad Street, Suite 310, Bethlehem, PA 18018, Phone: 610-865- 3000. Question Deadline 11/05/2024 All questions about the meaning or intent of the Contract Documents are to be directed as listed below. Interpretations or clarifications considered necessary by the Architect in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Architect and/or Construction Manager as having received the Bidding Documents. Questions received less than five (5) days prior to the date for opening of Bids may not be answered. All questions must be submitted in writing as follows. Phone calls are not permitted. 5.3.1 All questions must be sent to: Shannon Abraham (shannon.abraham@kcba-architects.com) KCBA Architects (KCBA) 5.3.2 All MEP questions must be copied to: Jeff Machik (jmachik@snyderhoffman.com)Snyder Hoffman Associates5.3.3 All Site questions must be copied to: Terry DeGroot (tdegroot@terraformengineering.com)Terraform Engineering 5.3.4 All questions must be copied to: Kim LaBrake (kjl@dhuy.com) Tammy Smale (smale.tammy@pvbears.org) CHA Pleasant Valley School District The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Hazardous materials removal bidding as a concurrent project 2. Selective demolition 3. Building construction for new addition 4. Renovations 5. Associated site work The Work under the Plumbing Construction Contract includes all construction and other activities traditionally recognized as plumbing work required by any of the Contract Documents including, but not limited to, the P series Plumbing drawings, FP series Fire Protection drawings, specification Divisions 00, 01, 21, 22, and portions of divisions 02, 03, 07, 11, 12, 13, 31, and 33 as required to complete contract work except when specifically assigned to another contract for construction. Work in the Plumbing Contract includes, but is not limited to, the following: 1. Selective demolition of existing plumbing systems, equipment, and accessories as noted on drawings and as required for renovation work. Disconnect and cap all utilities to plumbing fixtures and equipment noted to be removed. 2. Sanitary drain and vent piping systems. 3. Grease waste drainage piping system and exterior below grade grease interceptor including final connection to sanitary sewer 5' beyond grease interceptor. Refer to Multiple Prime Coordination Clarifications. 4. Acid resistant drainage piping system and exterior below grade acid neutralization tank including final connection to sanitary sewer 5' beyond acid neutralization tank. Refer to Multiple Prime Coordination Clarifications. 5. Interior Rain water/storm water including courtyards and Roof drainage piping systems to five 5' beyond building footprint. Refer to Multiple Prime Coordination Clarifications. 6. LPG/Propane gas piping distribution systems. Refer to Multiple Prime Coordination Clarifications. 7. Natural gas. PC responsibilities for propane gas service shall begin at outlet of second stage regulators including shutoff valve and final connection to regulator outlet and shall be as stated on the Drawings. 8. Plumbing Equipment including domestic water heaters, sump pumps, hot water recirculation pumps, grease interceptors, acid neutralization tanks. 9. Domestic water distribution systems including connection to existing domestic water service equipment. 10. Plumbing fixtures 11. Domestic water heaters and associated appurtenances including combustion air and vent piping. 12. Fire suppression hydraulic calculations to size fire suppression system. 13. Design Build Fire suppression sprinkler system including sprinkler piping and heads, valves, supervisory flow and tamper switches, trim, accessories, and supports. 14. Fire protection equipment including fire water storage tank, fire pump house building, fire pumps, etc. Refer to Multiple Prime Coordination Clarifications. 15. Provide fire suppression system drawings and hydraulic calculations and submit for approval by local AHJ and Owners Insurance carrier. 16. Perform all required Fire Protection system testing, flushes, and fills, at the completion of each Phase. 17. Plumbing connections to equipment furnished by the General Construction Contract, Plumbing Contract, HVAC Contract, and Electrical Contract. 18. Preparing of sprinkler and plumbing coordination drawings and assisting Project Coordinator in preparation of coordination drawings. 19. Coordination of work with all contractors including, but not limited to Electrical, General, and HVAC contractors. Coordinate and confirm locations and rough-in for all work with all contractors. Make location adjustments as required. 20. Food Service equipment connections and required appurtenances/accessories. 21. Firestopping of Plumbing Contract Work. 22. Provide temporary water service for construction per Temporary Facilities specifications as required. 23. Contractor shall include temporary connections (including additional piping and valves) as required to keep existing systems active until connection to permanent system is complete. Maintain operation of out of Phase existing systems at occupied areas. Coordinate all required shutdowns of existing systems with Owner. 24. Hangers and Supports for all work of the Plumbing Contract 25. Required piping specialties, piping and equipment identification, meters and gauges, expansion fittings, vibration isolation, and insulation for all work of the Plumbing Contract

Bid Results

Educational

$5,223,000.00

Public - City

Addition, Demolition, Renovation, Site Work

509

57

180

5

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Temporary Water, Construction Facilities, Sanitary Facilities, Temporary Construction, Construction Aids, Vehicular Access and Parking, Traffic Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Operation Data, Maintenance Data, Bonds, Warranties, Project Record Documents, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings, Metal Floor Plates, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Sheathing, Subflooring, Underlayment, Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Siding, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Aluminum Windows, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Masonry Flooring, Stone Flooring, Wood Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Wall Coverings, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Chalkboards, Markerboards, Directories, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Exterior Specialties, Protective Covers, Canopies, Flagpoles
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment, Educational and Scientific Equipment, Audio-Video Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Multiple Seating, Other Furnishings, Site Furnishings
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains, Special Instrumentation, Meteorological Instrumentation
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire Pumps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Storm Drainage, Roof Drains, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Instrumentation and Control Devices for HVAC, Pneumatic and Electric Control System for HVAC, Sequence of Operations for HVAC Controls, Facility Fuel Systems, Facility Fuel Piping, Facility Fuel-Oil Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central Heating Equipment, Breechings, Chimneys, and Stacks, Gas Vents, Central Cooling Equipment, Packaged Water Chillers, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Fan Coil Units, Unit Heaters, Radiant Heating Units
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Vibration and Seismic Controls for Electrical Systems, Identification for Electrical Systems, Overcurrent Protective Device Coordination Study, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Engine Generators, Battery Equipment, Batteries, Static Uninterruptible Power Supply, Transfer Switches, Automatic Transfer Switches, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Public Address and Mass Notification Systems, Distributed Systems, Clock Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Public Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, Utility Substations, Communications Utilities, Communications Structures, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Clamps, Lifts, Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors, Gas and Liquid Storage, Gas and Liquid Storage Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
416
Active Projects
238
Bidding Soon
3,937
All Active Projects
1,770
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2024

December 27, 2024

img_map_placeholder

1671 US-209, Brodheadsville, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Additions and Renovations to Pleasant Valley High School - Contract No. 4: Plumbing Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.