Renovation of an educational facility in Beulah, North Dakota. Working plans call for the renovation of a educational facility.

** As of 11/18/2024 all bids rejected. As of this time it is unknown if and when project will rebid.** Each bid must be accompanied by a separate envelope containing the contractor's license and bid security. The bid security must be in a sum equal to 5% of the full amount of the bid and must be in the form of a bidder's bond. A bidder's bond must be executed by the bidder as principal and by a surety, conditioned that if the principal's bid is accepted and the contract awarded to the principal, the principal, within ten days after notice of the award, shall execute a contract in accordance with the terms of the bid and the bid bond and any condition of the School Board. A countersignature of a bid bond is not required under this section. If a successful bidder does not execute a contract within the ten days allowed, the bidder's bond must be forfeited to the School Board and the project awarded to the next lowest responsible bidder. The bidder must be licensed for the full amount of the bid as required by NDCC 43-07-12. No bid may be read or considered if the bid does not fully comply with the requirements of this advertisement, and any deficient bid submitted must be resealed and returned to the bidder immediately. The School Board reserves the right to reject any and all bids and rebid the project until a satisfactory bid is received. The School Board further reserves the right to waive any informalities or irregularities in a bid received, and to accept that bid which appears to be in the best interests of the School District. The School District shall incur no legal liability or obligation until a contract is awarded and approved by the appropriate authorities. Middle School Roof specifications Remove existing gravel ballast and rubber membrane down to existing insulation Replace wet or damaged insulation. Furnish and install 1 layer of high-density recovery board Furnish and install a 60-mil fully adhered EPDM rubber roof system Furnish and install new rubber flashing at all curbs, walls & pipe penetrations New prefinished metal fascia system General clean-up upon completion Area 3, Area 5, Area 6

Final Planning

Educational

$320,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
6
Bidding Soon
73
All Active Projects
25
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2024

May 19, 2025

img_map_placeholder

1700 Central Ave N, Beulah, ND

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.