BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Blue Springs, Missouri. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

This project will make safety improvements along AA Hwy, a major collector, from 40 Hwy to the eastern City limits. This 2-lane rural highway is experiencing congestion as a result of 150% increase in volumes, which causes back-ups at a blind vertical curve. Five disabling injury crashes are recorded along the corridor. The corridor is also experiencing increased bicycle and pedestrian volume from the nearby Blue Springs South High School, William Bryant Elementary, Young Park, and recent multi-family infill development; it provides a direct connection to the Adams Dairy Parkway Trail. The project will improve the existing corridor to a two-lane roadway with a center turn lane and right turn lanes as warranted, as well as a shared use path, sidewalk, buffered bike lanes, lighting and amenities. Any questions regarding this Request for Qualifications shall be submitted to Adam Hilgedick no later than 5:00pm, October 4, 2024 by email at ahilgedick@bluespringsgov.com or phone at (816)228-0121. The project will consist of the following: topographic and boundary survey, development of plans, specifications, contract documents, and estimates, development of right-of-way documentation and exhibits, public involvement, comprehensive utility coordination services, bidding assistance, and construction services. Interested firms may indicate if they provide construction inspection services, however provision of inspection services will not be a scored component of the statements of qualifications. The project design components will include grading, new asphalt pavement, curb and gutter, hydraulic analysis, culvert extension and/or replacement, storm sewer, streetlighting, ADA compliant sidewalks, bike facilities, signing, pavement marking, watermain, and sanitary sewer design. Analysis and design of the intersection at AA Highway & Adams Dairy Parkway may also be included in this project. The design consultant may also be requested to provide assistance with acquisition activities. The City may, at its election, waive any minor informalities or irregularities in qualifications received or reject any or all qualifications. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$100,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
32
Bidding Soon
675
All Active Projects
291
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

img_map_placeholder

SE Adams Dairy Pkwy & SE County Rd AA, Blue Springs, MO

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.