BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 17, 2024 at 7:00 PM

Updated December 18, 2024

Site work for a water / sewer project in Clarksburg, West Virginia. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: This contract is split into two main components: water and sewer. Water work, to be supervised by Owner Clarksburg Water Board, includes replacement of main water line, service lines, fire hydrants, gate valves, and water meter settings between the Milford Street Bridge and the Joyce Street Exit along Main and Pike Streets in Downtown Clarksburg. Construction will include all necessary appurtenances, reclamation, and road repair to perform a water line replacement project. Sewer work, to be supervised by Owner City of Clarksburg Sanitary Board, includes replacement of main sanitary sewer line, sanitary sewer laterals, manholes, cleanouts, new storm sewer, drop inlets, storm manholes, and a headwall between the Milford Street Bridge and 5th Street along Main and Pike Streets in Downtown Clarksburg. Construction will include all necessary appurtenances, reclamation, and road repair to perform a construction of new sanitary and storm sewer lines. Sewer work will also include fold-and-form lining of combined sewer lines and poly-lining of existing manholes along a portion of the interceptor near the Milford Street Bridge and also between 5th Street and EB Saunders Way in Downtown Clarksburg. The Work will be substantially completed within 365 calendar days after the date when the Contract Times commence to run, and completed and ready for final payment within 395 days after the date when the Contract Times commence to run. Parts of the Work must be substantially completed on or before the following Milestone(s): Milestone 1 - All storm sewer, sanitary sewer, and water line work along WV Route 20 (Main Street and Pike Street) is to be substantially complete by August 31, 2025 as not to delay the DOH paving project scheduled for fall of 2025. a. Bids shall be accompanied by a certified check or bid bond payable to Clarksburg Water Board and City of Clarksburg Sanitary Board in an amount equal to five percent (5%) of the base bid Deadline applies to all versions of Contract Plan Set Sheets 1-19, 25, 26, 28-35, and 39-41. b. All remaining work shall be completed by the substantial completion date set forth in Section 4.02. Liquidated damages shall be $1,000 per day to each utility. Question Deadline 10/04/2024 Biddershallsubmit all questions about the meaning or intent of the Bidding Documentsto Engineer in writing Questions received less than seven days prior to the date for opening of Bids may not be answered

Award

Water / Sewer

$26,873,110.00

Public - City

Site Work

198

17

19

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
50
Bidding Soon
844
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2024

November 17, 2024

Project location map

W Main St & W Pike St, Clarksburg, WV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.