BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Highlands Ranch, Colorado. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; road / highway; and road / highway.

Trail and University Blvd. Pedestrian Grade Separation. The Objective of the Project is to Construct a Grade Separation for Bicyclists and Pedestrians on the C-470 Trail to Cross Over University Boulevard North of the C-470 Westbound on and Off Ramps. Question Deadline 10/08/2024 at 5:00 PM MT All Questions Are Due to Brolin Bundy P.e., Project Engineer . The Project Includes the Following Major Items and Approximate Quantities: o 479 Sy Removal of Sidewalk o 105 Lf Removal of Curb and Gutter o 4,375 Sf Sod o 267 Ton Aggregate Base Course (Class 6) o 53,141 Lb Reinforcing Steel Prior to Submitting a Bid Proposal, Bidders Shall Have Received Prequalification Status (Active Status) With the Colorado Department of Transportation to Bid on Individual Projects of the Size and Kind of Work as Set Forth Herein. The Bridge Will Be a Three-span Pre-fabricated Truss With Precast Concrete Girders for the Approach Spans on Concrete Piers. Additional Work Includes Trail Modifications to Tie Into the Existing Trail System, Curb and Gutter, Curb Ramps, and Drainage Improvements. The Contractor Awarded a Contract for This Project Shall Name Cdot and Douglas County as an "additional Insured" on Its General Liability and Automobile Liability Policies. Scope of Work. Contractor shall complete all work as specified or indicated in the Contract Documents. The work is generally described as follows: The objective of the project is to construct a grade separation for bicyclists and pedestrians on the C-470 Trail to cross over University Boulevard north of the C-470 westbound on and off ramps. The bridge will be a three-span prefabricated truss with precast concrete girders for the approach spans on concrete piers. Additional work includes trail modifications to tie into the existing trail system, curb and gutter, curb ramps, and drainage improvements. The Contractor shall furnish all of the necessary supervision, materials, tools and supplies and perform all of the labor and other services necessary to complete this Contract.

Post-Bid

Sidewalks / Parking Lot

$300,000.00

Public - County

Paving, Site Work

154

14

2

6

Subscribe For Documents

102 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
38
Bidding Soon
980
All Active Projects
410
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2024

November 21, 2024

img_map_placeholder

S University Blvd & C-470 Trail, Highlands Ranch, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.