Published November 6, 2024 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Highlands Ranch, Colorado. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; road / highway; and road / highway.

Trail and University Blvd. Pedestrian Grade Separation. The Objective of the Project is to Construct a Grade Separation for Bicyclists and Pedestrians on the C-470 Trail to Cross Over University Boulevard North of the C-470 Westbound on and Off Ramps. Question Deadline 10/08/2024 at 5:00 PM MT All Questions Are Due to Brolin Bundy P.e., Project Engineer . The Project Includes the Following Major Items and Approximate Quantities: o 479 Sy Removal of Sidewalk o 105 Lf Removal of Curb and Gutter o 4,375 Sf Sod o 267 Ton Aggregate Base Course (Class 6) o 53,141 Lb Reinforcing Steel Prior to Submitting a Bid Proposal, Bidders Shall Have Received Prequalification Status (Active Status) With the Colorado Department of Transportation to Bid on Individual Projects of the Size and Kind of Work as Set Forth Herein. The Bridge Will Be a Three-span Pre-fabricated Truss With Precast Concrete Girders for the Approach Spans on Concrete Piers. Additional Work Includes Trail Modifications to Tie Into the Existing Trail System, Curb and Gutter, Curb Ramps, and Drainage Improvements. The Contractor Awarded a Contract for This Project Shall Name Cdot and Douglas County as an "additional Insured" on Its General Liability and Automobile Liability Policies. Scope of Work. Contractor shall complete all work as specified or indicated in the Contract Documents. The work is generally described as follows: The objective of the project is to construct a grade separation for bicyclists and pedestrians on the C-470 Trail to cross over University Boulevard north of the C-470 westbound on and off ramps. The bridge will be a three-span prefabricated truss with precast concrete girders for the approach spans on concrete piers. Additional work includes trail modifications to tie into the existing trail system, curb and gutter, curb ramps, and drainage improvements. The Contractor shall furnish all of the necessary supervision, materials, tools and supplies and perform all of the labor and other services necessary to complete this Contract.

Post-Bid

Sidewalks / Parking Lot

$300,000.00

Public - County

Paving, Site Work

154

14

2

6

Subscribe For Documents

102 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Fill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
63
Bidding Soon
942
All Active Projects
411
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2024

November 21, 2024

img_map_placeholder

S University Blvd & C-470 Trail, Highlands Ranch, CO

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Trail and University Blvd. Pedestrian Grade Separation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.