Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Phoenix, Arizona. Contact the soliciting agency for additional information.
SCOPE OF WORK The project scope includes, but is not limited to, the following: o Collect and review all available assessments, design drawings, as-builts, and operation and maintenance information associated with force mains, valves and valve vaults, and cathodic protection. o Perform site visits as needed to gather appropriate information. o Hold meetings as appropriate with Wastewater Engineering and Wastewater Collection staff. o Work closely with the Lift Station and Odor Control Program Manager to coordinate future Capital Improvement Projects. o Develop assessment and rehabilitation cycles for the Force Main Program. This includes force main cleaning and inspection, redundant force mains, cathodic protection, and valves and valve vaults. o Develop a plan for prioritizing projects. o Develop an overall schedule and budget for the Capital Improvement Projects under the Force Main Program for future fiscal years. o Revise and update the schedule and budget as needed. Use of UNIFIER, an Application Service Provider (ASP) web-based project management database, may be required. The following information provides a guideline for utilization. Any questions related to the requirements of UNIFIER should be directed to the Project Manager. o The Consultant will be required to maintain all project records in electronic format. o The City provides an ASP web-based project management database which the Consultant will be required to utilize in the fulfillment of the contract requirements. o The Consultant shall provide a computerized networked office platform with broadband internet connectivity. o UNIFIER training will be provided through the City of Phoenix to firms under contract. Evaluation Meeting October 29, 2024 The City of Phoenix is seeking a qualified consultant team to provide professional services for a Program Manager for the Force Main Program. Program Manager Services may include researching past assessments and Capital Improvement Projects; reviewing operation and maintenance records; identifying, scheduling, and budgeting Capital Improvement Projects for future fiscal years; and developing assessment and rehabilitation cycles. This project sites are citywide. The City of Phoenix (City) wastewater collection system currently has 77 miles of force mains ranging from 4 inches to 48 inches in diameter. Approximately 64% of the force mains in the wastewater collection system are Ductile Iron Pipe. The City is seeking a Program Manager for the Force Main Program. The Program Manager will be responsible for researching past assessments and Capital Improvement Projects to develop a comprehensive overview and status of the force mains in the wastewater collection system. This includes force main condition assessments, rehabilitation projects, redundant force mains projects, condition of valves and valve vaults, cathodic protection, and review of operation and maintenance records. The Program Manager will first focus on reviewing all available data and incorporating input from Engineering and Operations staff. The Program Manager will develop criteria for prioritizing projects and develop a schedule for assessments for design, and construction. The goal of this Program is to assist Wastewater Engineering with identifying, scheduling, and budgeting Capital Improvement Projects for future fiscal years and developing assessment and rehabilitation cycles. Questions pertaining to this selection process or contract issues should be directed to the Contracts Specialist, Heather Roye at (602) 261-8894 or email heather.roye@phoenix.gov. The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 11, 2025
Multiple Locations, Phoenix, AZ
Related To This Project
Phoenix, AZ
Bid Date: Oct 17 2024
Phoenix, AZ
Bid Date: Sep 26 2024
Phoenix, AZ
Bid Date: Oct 25 2024
Phoenix, AZ
Bid Date: Oct 18 2024
Phoenix, AZ
Bid Date: Nov 06 2024
Phoenix, AZ
--
Phoenix, AZ
--
Phoenix, AZ
Bid Date: Oct 15 2024
Phoenix, AZ
Bid Date: Oct 16 2024
Phoenix, AZ
--
Phoenix, AZ
Bid Date: Nov 22 2024
Phoenix, AZ
--
Phoenix, AZ
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.