BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 19, 2024 at 8:00 PM

Updated October 20, 2024

Site work for a water / sewer project in Silverado, California. Completed plans call for site work for a water / sewer project.

Scope of Services Construction of a new temporary and permanent 8-inch water pipeline on Silverado Canyon Road Bridge 177 (Bridge No. 55C-0177), which will be replaced due to structural deficiencies. The temporary water pipeline will be constructed prior to bridge construction work while the permanent will be installed after construction of the south side of the bridge. Prequalification to be placed on the Project Bidders List for this Project is closed. Q&A Deadline 10/03/2024 5:00 PM (PDT) Online Q&A Yes The deadline to submit contractor questions Liquidated Damages $1,000 per calendar day Project Type Bid Response Types Line Items Subcontractor ,Bid Form (required) Type of Award Lump Sum Certified Check Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% The Contractor to whom this project is awarded must possess a class A contractors license, issued by the State of California, which is current and full.

Post-Bid

Water / Sewer

$515,000.00

Public - County

Site Work

11

14

2

6

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
662
Active Projects
299
Bidding Soon
3,695
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2024

November 18, 2024

Project location map

Silverado Canyon Rd, Silverado, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.