BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 18, 2025 at 8:00 PM

Updated April 19, 2025

Site work for a bridge / tunnel in Shoreham, Vermont. Conceptual plans call for site work for a bridge / tunnel.

As of April 18, 2025, an engineer has been selected for the project. Bidding is estimated to take place in late 2026 and construction is estimated to take place in mid to late summer of 2027. *The closed solicitation has been included below for reference: Shoreham TAP TA24 (18) The Town of Shoreham is requesting proposals from consultants to design a box culvert at TH15 Doolittle Road The method of Contractor Selection has not been Determined at this time.

Conceptual

Bridges / Tunnels

$70,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
57
Bidding Soon
840
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.