Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 18, 2025 at 8:00 PM

Updated April 19, 2025

Site work for a bridge / tunnel in Shoreham, Vermont. Conceptual plans call for site work for a bridge / tunnel.

As of April 18, 2025, an engineer has been selected for the project. Bidding is estimated to take place in late 2026 and construction is estimated to take place in mid to late summer of 2027. *The closed solicitation has been included below for reference: Shoreham TAP TA24 (18) The Town of Shoreham is requesting proposals from consultants to design a box culvert at TH15 Doolittle Road The method of Contractor Selection has not been Determined at this time.

Conceptual

Bridges / Tunnels

$70,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
65
Bidding Soon
1,137
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed