BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 9, 2025 at 7:00 PM

Updated January 11, 2025

Renovation of a museum in Columbus, Ohio. Completed plans call for the renovation of a museum.

The final date questions are due to the A/E (if you wish to guarantee answer in final Addendum) is: Friday October 18, 2024, at 12:00 Noon. The anticipated project cost is $460,000. A Bid Guaranty and Contract Bond are required as defined in the Contract Documents. Prevailing wage rates for Franklin County as determined by the State of Ohio, Department of Commerce, Division of Labor and Safety will be applicable to this Work. 1. The amount of the Certified Check, Cashierís Check or Letter of Credit shall be equal to ten percent (10%) of the base bid plus add alternates. The following is a general description of the Work involved in this Project and is not intended to comprise a complete description of all work required. 1. Demolition: a. Remove (2) existing diesel generators, including exhaust, fuel, and water piping. b. Remove (2) existing substation secondary low-voltage distribution sections. c. Remove existing abandoned cooling tower and foundations. d. Remove (2) existing 500-gallon underground fuel storage tanks, piping, fuel pumps, and fuel level gauges. e. Remove (2) existing surge protection devices. 2. New Work: a. Install new diesel emergency generator with sub-base fuel tank furnished by Owner. b. Install new substation secondary low-voltage distribution sections furnished by Owner. c. Install new distribution panels and associated surge protection devices furnished by Owner. d. Install new transfer switches furnished by Owner. e. Provide diesel fuel in sub-base fuel tank. f. Provide new generator reinforced concrete pad. g. Provide lighting fixture. h. Provide wiring devices. i. Provide all wiring and conduit. B. The entire project is required to be completed to accommodate Owner-occupied areas and ongoing operations. Contractors shall cooperate and assist with this requirement. Direct all questions and comments to the RDFA Project Manager: Mr. Jim Bentz V: (614) 451-2248 Email: jbentz@rdfa.com Change the anticipated project cost to $576,000.

Post-Bid

Museum

$576,000.00

Public - State/Provincial

Renovation

15

19

6

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
332
Active Projects
206
Bidding Soon
2,347
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

April 30, 2025

Project location map

800 E 17th Ave, Columbus, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.