BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Travelers Rest, South Carolina. Conceptual plans call for the construction of a educational facility; and for site work for a educational facility.

The intent is to award an Architectural firm a contract in mid-December of 2024. Construction is targeted to start in October of 2025 and be substantially complete by June of 2027 so that the school facility can open for students in August of 2027. Construction of the new building will be accomplished via the Construction Manager at Risk delivery method with a CM@R firm engaged after schematic level drawings. The design process will include a programming effort coordinated with the District Planning and Demographics department (a draft program has been provided for information purposes). The design will include approximately 150,000 SF (+/-) to provide adequate learning spaces for approximately 1,000 6th grade through 8th grade students. The site will include circulation, parking and a full complement of middle school athletic facilities -- track (with soccer field interior), baseball, softball and tennis. GCS maintains a written design guide for its facilities and expects that the facility will be designed in accordance with all applicable codes and the guide while taking into consideration the unique educational nature of the facility and best practices for sustainability. Question Deadline 09/30/2024 at 4:00 PM ET The deadline for written questions about the Form is at All questions should be submitted via E-mail to Matt Pettit jpettit@greenville.k12.sc.us. A written Addendum to respond to questions about the Form that were received by the above deadline shall be issued by GCS no later than EOD Tuesday, October 1st, 2024. Firms that are short-listed for interviews based upon their submission will be informed by Friday, October 11th, 2024. Interviews of the short-listed firms are anticipated to be scheduled on October 15th or 16th, 2024. Interviews will allow up to forty-five (45) minutes for presentation followed by a fifteen (15) minute question and answer period. The Design Team should check in with the receptionist upon arrival. The Design Team may arrive 15 minutes in advance of their scheduled interview for set-up. The method of Contractor Selection has not been Determined at this time.

Conceptual

Educational

$24,000,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
38
Bidding Soon
754
All Active Projects
286
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2025

img_map_placeholder

1606 Geer Hwy, Travelers Rest, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.