Renovation of a municipal facility in San Carlos, California. Completed plans call for the renovation of a municipal facility.

For the following public work: SOUTH BAYSIDE WASTE MANAGEMENT AUTHORITY TRANSFER STATION FLOOR REPAIR 333 SHOREWAY ROAD, SAN CARLOS CA, 94070 Project Description: Repair and recover worn areas around approximately 7 places on the Transfer Station floor where erosion of concrete has revealed upper layer steel reinforcing bars. Place a total of approximately 2,500 square feet of repair concrete at an average depth of 1.5 inches. Prepare the areas for patching and place the products using the procedures and methods known to the specialty contractor. If steel reinforcing bars appear to have been cut out, lay replacement bars along the alignment of the cut-out bars and provide 16-inches of lap joint overlap at each end. If you offer more than one concrete repair product or system of products (that is, materials with different strengths/wear characteristics), please do propose more than one and give us a choice of durability and price. If the Contractor proposes more than one recommended product, please provide the Owner with descriptions and prices for each. Work shall occur during weekend hours, starting Friday evening after 5:00 PM if need be. Floors and roads shall return to service the following Monday morning, prior to 2:00 AM. Coordinate work weekend, equipment and material delivery and storage, start and finish times, and other site matters with the facility general manager, Dwight Herring. On the weekend that the work will be performed, the facility general manager will have waste materials removed so that the areas needing repair are open to inspection and work. The Owner is not able to determine the exact extent of the deteriorated flooring. The Contractor shall test the integrity of the concrete in the worn areas and determine the extent of the repairs given the specified total quantity of repair material. The floor resurfacing Scope here designating technical specifications and portions of the floor of the Transfer Station to be resurfaced is not intended to be an exclusive description of work categories. The Contractor shall determine, specify and include in its pricing all materials, labor, equipment, and daily cleanup measures necessary to complete the Scope as shown and specified. This project requires a very experienced installer which has been previously approved by the manufacturer. An installer employing personnel with a minimum of 10 years' experience who has completed topping Work similar in material, design, and extent to that indicated for this Project and whose work has resulted in construction with a record of similar size and application is required. Recent experience (dating no earlier than year 2011) must include at least 5 successful in-service projects, especially for public agencies and/or waste disposal facilities. Installer must be approved in writing by material manufacturer prior to bid. Work shall be completed within 60 Days from the date when Contract Time commences to run. Procurement of Bidding Documents: of Bidding Documents: Bidding Documents contain the full description of the Work. Bidders may examine a complete hard-copy set of the Bidding Documents at the Authority's main office, located at 1245 San Carlos Avenue, Suite E, San Carlos, CA 94070. Instructions: Bidders shall refer to Document 00 2113 (Instructions to Bidders) for required documents and items to be submitted via email to bids@rethinkwaste.org no later than the time and date set forth in Paragraph 1.01 above Pre-Bid Site Visit: Owner will conduct a Non-Mandatory Pre-Bid Conference and Site Visit at the bidder's request based on staff availability. The worn areas are typically under piles of MSW or green waste. The SBWMA cannot guarantee that the worn areas will be visible at the time of a pre-bid site visit. Bid Preparation Cost: Bidders are solely responsible for the cost of preparing their Bids. Reservation of Rights: Owner specifically reserves the right, in its sole discretion, to reject any or all Bids, to re-bid, or to waive inconsequential defects in bidding not involving time, price or quality of the work. Owner may reject any and all Bids and waive any minor irregularities in the Bids. ARTICLE 2 LEGAL REQUIREMENTS 2.01 Required Contractor's License(s): A California B contractor's license is required to bid this contract. The Bidder's license(s) must remain active and in good standing throughout the term of the Contract. Joint ventures must secure a joint venture license prior to award of this Contract. Specialty work may require a specialty contractor's license C-8 held by Bidder or a listed subcontractor. 2.02 Required Contractor and Subcontractor Registration A. Owner shall accept Bids only from Bidders that (along with all Subcontractors listed in Document 00 4330, Subcontractor List) are currently registered and qualified to perform public work pursuant to Labor Code Section 1725.5. B. Subject to Labor Code Sections 1771.1(c) and (d), any Bid not complying with paragraph 2.02A above will not be considered; provided that if Bidder is a joint venture (Business & Professions Code Section 7029.1) or if federal funds are involved in the Contract (Labor Code Section 1771.1(a)), Owner may accept a non-complying Bid provided that Bidder and all listed Subcontractors are registered at the time of Contract award. 2.03 Substitution of Securities: Owner will permit the successful bidder to substitute securities for any retention monies withheld to ensure performance of the contract, as set forth in Document 00 6290 Escrow Agreement For Security Deposits In Lieu Of Retention and incorporated herein in full by this reference, in accordance with Section 22300 of the California Public Contract Code. 2.04 Prevailing Wage Laws: The successful Bidder must comply with all prevailing wage laws applicable to the Project, and related requirements contained in the Contract Documents. Copies of the general prevailing rates of per diem wages for each craft, classification, or type of worker needed to execute the Contract, as determined by Director of the State of California Department of Industrial Relations, may be obtained from the California Department of Industrial Relations website [http://www.dir.ca.gov/OPRL/DPreWageDetermination.html], and are deemed included in the Bidding Documents. Upon request, Owner will make available copies to any interested party. Also, the successful Bidder shall post the applicable prevailing wage rates at the Site. 2.05 Prevailing Wage Monitoring: This Project is subject to prevailing wage compliance monitoring and enforcement by the Department of Industrial Relations. 2.06 COVID-19 Compliance: The Bidder and all Subcontractors under the Bidder shall comply with applicable federal, State, and local requirements relating to COVID-19 or other public health emergency/epidemic/pandemic including, if required, preparing, posting, and implementing a Social Distancing Protocol.

Award

Municipal

$420,847.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
84
Bidding Soon
1,609
All Active Projects
613
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2024

November 11, 2024

img_map_placeholder

333 Shoreway Rd, San Carlos, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.