Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Avery, Idaho. Working plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
East Fork Ninemile Creek Waste Consolidation Area - Phase 3 Final Cover Project. Scope The work will involve installation of the final cover system of the EFNM WCA to isolate previously place mine waste from the basin. The majority of the work will be located in steep and remote mountainous terrain. Activities include, but are not limited to, the following: Access road maintenance. Erosion control best management practice (BMP) installation and maintenance. Clearing, grubbing, and log and root wad salvage and stockpiling. Drainage control features (i.e., channels, benches, swales) installation. Quarry development (and closure), which includes blasting and processing blasted rock to create specific construction materials. Development and implementation of an Environmental Protection Plan with activities that include: stormwater management, decontamination procedures, site winterization, and housekeeping. Installation of 3 layer liner system consisting of a Geotextile, textured Geomembrane, and Geocomposite Drainage layers. Installation of liner cover system consisting of 1-inch minus material, salvaged soil and lime-amended cover soil. Amend final cover system with Proganics BSM and Richlawn Fertilizer Installation of quarry access road. Permanent seed on the final cover system. Performing quantity and as-built surveys. Implementing a robust quality assurance project plan for certifying materials generated in the quarry are clean. Preparing as-build record drawings, and preparing documentation and reporting to meet the Coeur d'Alene Trust and the EPA requirements.
Final Planning
Water / Sewer
$400,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 24, 2025
Multiple Locations, Avery, ID
Related To This Project
Avery, ID
Bid Date: Sep 26 2024
Avery, ID
Bid Date: Jul 21 2023
Avery, ID
Bid Date: Mar 14 2023
Avery, ID
Bid Date: Sep 02 2022
Avery, ID
Bid Date: Jul 18 2022
Avery, ID
Bid Date: Nov 20 2022
Moscow, ID
Bid Date: Oct 17 2024
Boise, ID
Bid Date: Oct 17 2024
Parma, ID
Bid Date: Oct 24 2024
Coeur D Alene, ID
Bid Date: Sep 26 2024
Boise, ID
Bid Date: Oct 17 2024
Salmon, ID
Bid Date: Oct 21 2024
Boise, ID
Bid Date: Oct 21 2024
Bonners Ferry, ID
Bid Date: Oct 10 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.