BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2024 at 7:00 PM

Updated March 25, 2025

Renovation of a municipal facility in Denver, Colorado. Working plans call for the renovation of a municipal facility.

The owner has determined a prequalified list of design builders. Contact details Tricia Ortega doti.procurement@denvergov.org Summary: The general scope of this Integrated Contract is to align both the design and construction improvements for Denver Arts and Venues (DAV) through one consistent workflow. The goal is to reduce duplicate work, replicated unforeseen conditions, and funnel communications and coordination through one (1) Program Management team. General Statement of Work: The general scope of this Integrated Contract is to align both the design and construction improvements for Denver Arts and Venues (DAV) through one consistent workflow. The goal is to reduce duplicate work, replicated unforeseen conditions, and funnel communications and coordination through one (1) Program Management team. The single program management team will provide maximum benefit and risk mitigation to the City, including the safety of users accessing this campus over the next several years. It is in the best interest of the City to align site access, safety controls, and overlapping design solutions within the campus in the most effective manner. Due to the time sensitive and critical operational schedule of this campus around Concert season, improvements to the RRA campus must be efficient, well-planned, and coordinated. Due to the short timeframe of construction installation during off seasons, proactive planning, early material procurement, and long-lead time collaboration is critical. Due to the limited access points for construction crews, equipment, large vehicles, and the general public, a single entity is needed to manage logistics of operations, deliveries, construction, subcontractors, and public access points. Due to the incredible opportunity that design solutions offer within the progressive RRA campus - as a world-renowned venue and destination - a full suite of design solutions should be considered at the campus-wide impact/benefit scale when any improvements are being considered. Due to the duration of project implementation (design + construction), multi-year planning of coordinated campus projects results in the most efficient and holistic campus wide strategic approach. Questions Deadline: October 11, 2024, at 11:00 a.m. local time. MWBE Participation Goal: 14% Prequalification: Each contractor must be prequalified in category 2B General Building - Occupied Buildings at or above the $25,000,000.00 monetary level in accordance with the City's Rules and Regulations Governing Prequalification of Contractors. Each contractor must have submitted a prequalification application a minimum of ten (10) calendar days prior to the Proposal due date. Applications must be submitted via B2Gnow. To view the Rules and information on how to apply, please visit our website. Contract Administrator: Tricia Ortega - doti.procurement@denvergov.org Miscellaneous: Contracts for construction, reconstruction, and remodeling are subject to the City prevailing wage rate requirements established pursuant to Section 20-76, DRMC. City contracts are subject to payment of City Minimum Wage established pursuant to Section 20-82 through 20-84 DRMC. As the City's best interests may appear, the Executive Director of the Department of Transportation and Infrastructure reserves the right to waive informalities in, and to reject any or all proposals. Question Deadline 10/11/2024 at 11:00 AM MT

Final Planning

Municipal

$510,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

144 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
212
Active Projects
102
Bidding Soon
1,384
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.