BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Poland, Maine. Completed plans call for site work for a water / sewer project.

The second bid package includes beach walk upgrades and utility upgrades The Bidder shall include a satisfactory Bid Bond (section 00 43 13) or a certified or cashier's check for 5% of the bid amount with the completed bid form submitted to the Owner. If noted above as required, or if any combination of Base Bid and Alternate Bids amounts selected in the award of the contract exceeds $125,000.00, the selected Contractor shall furnish a 100% contract Performance Bond (section 00 61 13.13) and a 100% contract Payment Bond (section 00 61 13.16) in the contract amount to cover the execution of the Work. Pre-qualified General Contractors are not utilized on this project. Questions and comments regarding the project design specifications or drawings shall be directed in writing to the Consultant during the bid period prior to the question and comment deadline of 5:00 p.m. on 07 October 2024. Colby Company LLC Gary Collette garyc@colbycoengineering.com . The 01 May 2025 end date is the turnover date to the bureau of parks and lands.. The contract shall designate the Substantial Completion Date on or before 01 May 2026, and the Contract Final Completion Date on or before 15 May 2026. In certain circumstances, the Bureau of General Services may require the Bidder to surrender a valid paper copy of the bid form or the bid security document. Questions and comments on the bid opening process shall be addressed to: Paul R. Barber, Contracting Officer's Representative, Bureau of General Services, 77 State House Station, Augusta, Maine 04333-0077, BGS.Architect@Maine.gov. WORK INCLUDED: 1. Waste Management Plan development and implementation. 2. Meetings: goals, issues and training for the Waste Management Plan. 3. Techniques to minimize waste generation. 4. Sorting and separation of waste materials. 5. Reuse: reuse of salvaged materials on site. 6. Salvage: salvage of existing materials and items for reuse or resale. 7. Recycling: recycling of materials which cannot be reused or sold. 8. Records keeping: keeping of receipts and records of salvaged, recycled or landfilled materials.

Bid Results

Water / Sewer

$159,400.00

Public - State/Provincial

Site Work

116

27

4

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
13
Bidding Soon
455
All Active Projects
183
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2024

November 18, 2024

img_map_placeholder

26 State Park Rd, Poland, ME


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.