Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 7, 2024 at 7:00 PM
Updated November 8, 2024
Demolition, site work, paving and new construction of a civil project in Macon, Missouri. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; and road / highway.
As of November 7, 2024, this project has not yet been awarded. A timeline for award has not yet been established. The proposed work includes the construction of a new 212 foot three-span, prestressed concrete NU43 I-girder bridge with steel piling (HP12x53), concrete abutments, concrete piers, SL-1 railing, traffic control, and other required appurtenances. Special Needs: If you have special needs addressed by the Americans with Disabilities Act, please notify the County Clerk at 660-385-2913 at least 5 working days prior to the bid opening you plan to attend. The wage rates applicable to this project have been predetermined as required by law and are set forth in the bid proposal. When Federal wage rates are applicable and included, this contract is subject to the "Work Hours Act of 1962" (P.L. 87-581; Stat. 357) and implementing regulations. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109, and E.O. 11246 Macon County hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. The right is reserved to reject any or all bids. A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal. The DBE goal for this project is 4%. MODOT - Road & Bridge Work
Post-Bid
Bridges / Tunnels
$700,000.00
Public - County
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 24, 2024
November 25, 2024
Road 429, Macon, MO
Related To This Project
Macon, MO
Bid Date: Oct 08 2024
Macon, MO
Bid Date: Nov 08 2024
Macon, MO
Bid Date: Oct 21 2024
Macon, MO
Bid Date: Oct 21 2024
Macon, MO
Bid Date: Oct 22 2024
Macon, MO
Bid Date: Nov 11 2024
Macon, MO
Bid Date: Dec 05 2024
Macon, MO
Bid Date: Oct 02 2024
Macon, MO
Bid Date: Jul 15 2021
Macon, MO
Bid Date: Sep 18 2024
Macon, MO
Bid Date: Aug 26 2024
Macon, MO
Bid Date: Jul 22 2024
Macon, MO
Bid Date: Jun 18 2024
Macon, MO
Bid Date: May 23 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
