Published November 16, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a playground / park / athletic field in Berkeley Heights, New Jersey. Completed plans call for site work for a playground / park / athletic field.

https://ucnj.org/wp-content/uploads/2024/10/PB-Action-Report-Sept-2024.pdf 54 08/14/24 Rev SP BH 101;501/1;1-3 DH 1 Springfield Ave Union County Improvement Authority Park Park Improvement Approved 09/09/24 Prop.Units 0 Prop.SF 857 Ex.Lots 4 Prop.Lots 4 Total Lots 4 _______________________________________________________________________________ The UCIA is seeking to install a multi-use sport turf field to replace the existing multi-use spork natural grass field. The UCIA also wants to include a walking path, lighting, parking lot expansion and a restroom facility. The Project schedule anticipates the commencement of construction of the Project (Notice to Proceed) on or about November 19, 2024 in order to achieve substantial completion, with a Temporary Certificate of Occupancy at a minimum, and ready for occupancy by the County by no later than June 19, 2025, which is 212 Calendar Days from the issuance of the Notice to Proceed. This Project is being partially funded through State and Federal Grants awarded by the State of New Jersey. The Federal Grant funding is through the Coronavirus State Fiscal Recovery Fund-G2023- 79 under the American Rescue Plan Act of 2021, P.L. 117-2, as amended. The Project is being procured as a lump sum bid proposal and the Contract will be subject to New Jersey's Prevailing Wage Act, N.J.S.A. 34:11-56.25 et seq. In general, the work on this project consists of the demolition of the existing site, construction of a new asphalt parking lot complete with lighting; construction of two (2) concrete boat ramps; construction of a new restroom building complete with water, sewer and electrical services; construction of a pavilion with decorative concrete; construction of playground areas complete with poured-in-place rubber surfacing, seating areas and shade structures; construction of a new fitness area and synthetic rubber surface walking track; construction of new asphalt multi-purpose walking trails and concrete sidewalks; construction of various stormwater infrastructure with fencing; installation of various site amenities to including picnic tables, benches, shed, signage, bike rack, drinking fountain, and waste receptacles; and installation of topsoil and seed/sod, irrigation and landscaping 2. Contractor shall be responsible for furnishing and installing all soil erosion and sediment control per the contract documents. 3. Contractor shall be responsible for demolition of curb, asphalt, stone gravel, pavers, concrete, fencing, utilities, and trees/landscaping as shown on the contract documents. 4. Construction of concrete and asphalt walkways, fencing, concrete curbing, onsite utilities, stormwater systems, irrigation and landscaping as shown on the contract documents. 5. Furnish and install new restroom building construction facilities complete per the contract documents. Contractor shall be responsible to provide all items as listed on the project drawings and specifications and price shall include, but is not limited to, foundations, structural fill, DGA, wall systems, roof systems and accessories, architectural elements and finishes, furniture, and all appurtenances and all costs necessary to provide a fully functional building space for construction of process, mechanical, plumbing, and electrical equipment. 6. Furnish and install new pavilion structure complete per the contract documents. Contractor shall be responsible to provide all items as listed on the project drawings and specifications and price shall include, but is not limited to, foundations, stone veneer, cap stone, decorative column wrap, stamped concrete slab, and all appurtenances and all costs necessary to install the pavilion. 7. Furnish and install playground and fitness equipment complete per the contract documents. Contractor shall be responsible to provide all items as listed on the project drawings and specifications and price shall include, but is not limited to, ordering of equipment, delivery of equipment to the site, foundation preparation and installation, inspection, and all necessary items required to fully install the specified equipment. 8. Proposed site furnishings include two (2) 20' x 20' shade structures, six (6) standard picnic tables, two (2) ADA accessible picnic tables, a bike rack, a drinking fountain, thirty-nine (39) benches, fifteen (15) waste receptacles, and a shed. 9. Equivalent manufacturers have been provided in this specification. Any variations between these manufacturers are considered de minimus. The cost for any and all changes to the design due to variations between the two equivalents, including plumbing, HVAC, electrical, structural, site work, etc., shall be included in the various items bid within the proposal. The Contractor is responsible and obligated to successfully complete the entire project and to complete each and every necessary detail of every item required per bid documents. The contractor shall field verify all measurements prior to construction and/or preparation of shop drawings. Contractor is advised that this is lump sum contract. All work as indicated and incidental to work completion shall be incorporated into the project scope. The Bidder shall be responsible for delivery of all such RFIs to Dr. Bibi Taylor, Executive Director at btaylorUCIA@ucnj.org, with a copy to Jessica Hauber at jessica.hauber@rve.com, via email and to Troy Marzziotti at tmarzziotti@mastconstruction.com, no later than October 15, 2024. No oral interpretations and responses will be made. Responses to all RFI's will be made by Addenda no later than October 18, 2024.

Award

Playgrounds / Parks / Athletic Fields

$4,708,677.00

Public - City

Site Work

62

26

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Temporary Barriers and Enclosures, Temporary Tree and Plant Protection, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties, Project Record Documents
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Steep Slope Roofing, Shingles and Shakes, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Fluid-Applied Flooring, Resinous Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Mowing, Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding, Plants, Ground Covers, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
578
Active Projects
320
Bidding Soon
5,057
All Active Projects
2,431
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2024

November 19, 2024

img_map_placeholder

735-737 Springfield Avenue Heights, Berkeley Heights, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Springfield Avenue Park Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.