Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Fresno, California. Conceptual plans call for site work for a water / sewer project.
Services will include preparation of necessary plans, specifications, estimates and conducting necessary utility coordination for this project . In general: o Participate in coordination meetings with City Staff, Fresno Irrigation District (FID), and any other agencies needed. o Participate in key stakeholders meetings (City, public, schools, etc.) o Prepare utility notification letters to various utilities and agencies. o Preparation of Utility Communication Log to be completed and updated with every submittal, or upon request of City Project Management Team. o Lead the effort on utility relocations, including preparing and submitting required documents to various agencies. o Prepare and submit utility research. o Prepare and provide pothole exhibit based on utility research and engineers' recommendation showing potential utility conflicts. o Conduct site investigation in order to prepare construction documents. o Process City provided topographic survey information. o Provide Geotechnical testing as required. o Prepare required right-of-way exhibits, deeds and maps showing required right-of-way acquisition. o Prepare appraisal maps detailing all acquisitions and any Temporary Construction Easements. o Prepare construction plans, technical specifications, and construction cost estimates at each phase of work identified in the consultant agreement. o Submitting construction documents for review to City offices, utilities/agencies, and obtaining final signatures on construction documents. o As part of the construction phase and general construction contract administration, attend the preconstruction conference, review shop drawings and other contractor submittals, provide clarification of construction documents during construction, review and provide technical information for construction contract change order requests if necessary, and perform as many as two site visits during construction. o Prepare record drawing documents using the as-built improvements. f your firm is interested in this project, please submit Four (4) copies of your Statement of Qualifications that includes the following: o Cover letter o Overview of the firm and any proposed sub-consultant firm experience o Summary of the prime consultant and any sub-consultant firm experience and performance on similar projects completed in the last five years, including references, resumes for the Project Manager and key support staff including education, relevant past project experience, applicable licensing & certifications, and description of their assignment on this project o Work plan for identifying tasks to be completed by the Consultant team, approach to the work, and key issues for this project. o Schedule for project completion including the milestones identified in the work plan. o Listing of client references associated with completed projects would be desirable. o Certificate of Local Preference, if applicable o Signed Addenda issued during advertisement o The SOQ should be concise and shall not exceed THIRTY-FIVE (35) pages. Online Q&A No The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
$1,500,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 20, 2025
S Chestnut Ave & E Jensen Ave, Fresno, CA
Related To This Project
Fresno, CA
Bid Date: Oct 15 2024
Fresno, CA
Bid Date: Oct 24 2024
Fresno, CA
Bid Date: Oct 25 2024
Fresno, CA
Bid Date: Dec 03 2024
Fresno, CA
Bid Date: Oct 24 2024
Fresno, CA
Bid Date: Oct 11 2024
Fresno, CA
Bid Date: Nov 05 2024
Fresno, CA
Bid Date: Oct 24 2024
Fresno, CA
Bid Date: Oct 22 2024
Fresno, CA
Bid Date: Oct 22 2024
Fresno, CA
Bid Date: Oct 17 2024
Fresno, CA
Bid Date: Sep 30 2024
Fresno, CA
Bid Date: Oct 08 2024
Fresno, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.