BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Fresno, California. Conceptual plans call for site work for a water / sewer project.

Services will include preparation of necessary plans, specifications, estimates and conducting necessary utility coordination for this project . In general: o Participate in coordination meetings with City Staff, Fresno Irrigation District (FID), and any other agencies needed. o Participate in key stakeholders meetings (City, public, schools, etc.) o Prepare utility notification letters to various utilities and agencies. o Preparation of Utility Communication Log to be completed and updated with every submittal, or upon request of City Project Management Team. o Lead the effort on utility relocations, including preparing and submitting required documents to various agencies. o Prepare and submit utility research. o Prepare and provide pothole exhibit based on utility research and engineers' recommendation showing potential utility conflicts. o Conduct site investigation in order to prepare construction documents. o Process City provided topographic survey information. o Provide Geotechnical testing as required. o Prepare required right-of-way exhibits, deeds and maps showing required right-of-way acquisition. o Prepare appraisal maps detailing all acquisitions and any Temporary Construction Easements. o Prepare construction plans, technical specifications, and construction cost estimates at each phase of work identified in the consultant agreement. o Submitting construction documents for review to City offices, utilities/agencies, and obtaining final signatures on construction documents. o As part of the construction phase and general construction contract administration, attend the preconstruction conference, review shop drawings and other contractor submittals, provide clarification of construction documents during construction, review and provide technical information for construction contract change order requests if necessary, and perform as many as two site visits during construction. o Prepare record drawing documents using the as-built improvements. f your firm is interested in this project, please submit Four (4) copies of your Statement of Qualifications that includes the following: o Cover letter o Overview of the firm and any proposed sub-consultant firm experience o Summary of the prime consultant and any sub-consultant firm experience and performance on similar projects completed in the last five years, including references, resumes for the Project Manager and key support staff including education, relevant past project experience, applicable licensing & certifications, and description of their assignment on this project o Work plan for identifying tasks to be completed by the Consultant team, approach to the work, and key issues for this project. o Schedule for project completion including the milestones identified in the work plan. o Listing of client references associated with completed projects would be desirable. o Certificate of Local Preference, if applicable o Signed Addenda issued during advertisement o The SOQ should be concise and shall not exceed THIRTY-FIVE (35) pages. Online Q&A No The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$1,500,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
28
Bidding Soon
395
All Active Projects
172
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2025

img_map_placeholder

S Chestnut Ave & E Jensen Ave, Fresno, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.