BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a residential development in Waterloo, New York. Completed plans call for the demolition of a residential development; and for site work for a residential development.

In response to this bid solicitation, please bid a price that covers the demolition of the addresses listed herein, for all labor, materials, equipment, supplies, and incidentals necessary and required to complete the work of outlined below. Demolition projects must be undertaken consecutively or concurrently with one another. Demolition projects must be completed before the December 15th, 2024. The Contractor will provide the Land Bank with at least forty-eight (48) hours' notice prior to the commencing the work at each property. The contractor shall obtain, at its sole cost and expense, all permits, authorizations, approvals, and licenses necessary for the planning, performance, and completion of the Work in accordance with the requirements of the respective municipal agencies and other authorities having jurisdiction. The Contractor shall comply with all federal, state, county, city, town and other applicable laws, ordinances, rules, and regulations and all orders and rules of any duly constituted authorities affecting the Property or bearing on the performance of the work. This includes, but is not limited to 12 NYCRR Part 56-11.5 and all applicable Stormwater regulations. Contractor is required to follow the HCR-approved Soils Management Plan during all site activities related to demolition. The Contractor will contact Dig Safely NY at least forty-eight (48) hours prior to beginning any excavation at the Property. The Contractor will confirm that all utilities are disconnected before commencing any Work. Disconnections were ordered through NYSEG on June 20th, 2024 and each property was issued job numbers. The Contractor will demolish all buildings, structures, and driveways on, in, or upon the Property. The Contractor will provide the Land Bank with all bills of lading and dump tickets, for all hazardous and non-hazardous waste. The Contractor will completely remove all the construction materials and any contents of the demolished structures from the Property. The Contractor will arrange for transportation of the construction materials and any contents of the demolished structures to lawful disposal, storage, or recycling locations, as necessary. The Contractor will fill the foundation pit with appropriate materials. The foundation pit shall not be filled with debris. Any proposed fill must be approved in advance by the Land Bank's Engineer. Fill cannot include organic materials that will decompose and settle. Fill cannot include construction debris other than crushed concrete or crushed stone. Foundation walls must be removed to five (5) feet below grade. The Contractor must ensure that basement floors are broken up to allow for drainage. Place fill in basements and other voids within the Contract Line Limit. Where broken concrete and masonry materials are used for backfill, place fill in layers not exceeding 9 inches and compact each layer. Crushed concrete and masonry may not be used as fill material outside the limits defined by the original building foundation walls. Final 12 inches of backfill below topsoil elevations must be select fill. Backfill below the final 12 inches with Engineered or Granular Fill. ENGINEERED FILL: NYSDOT ITEM 304.12, AS NOTED IN THE PROJECT GEOTECHNICAL EVALUATION REPORT. PLACE IN 6" TO 9" LIFTS. COMPACT EACH LIFT TO AT LEAST 95% MAXIMUM DENSITY AS DETERMINED BY THE MODIFIED PROCTOR METHOD, WITH A MOISTURE CONTENT WITHIN TWO PERCENT OF OPTIMUM. PROVIDE BENEATH FOOTINGS AS REQUIRED, AS BACKFILL AGAINST FOUNDATION WALLS, AND BENEATH FLOOR SLAB AND SUBBASE MATERIAL Select Fill: Sound, durable, sand, gravel, stone, or blends of these materials, free from organic and other deleterious materials. Sieve Percent Passing 4 Inch 100 No. 40 0-70 No. 200 0-15 The Contractor must contact the Land Bank's Engineer for inspection of both the fill and foundation pit. The Contractor will finish grading the land on the Property so that there is no standing water on the property or adverse drainage impacts to adjacent property. The Contractor will add sufficient topsoil and will ensure that the property is free from rocks and other items that would prevent grass growth. The Contractor must ensure that there is a minimum of 6" of clean and screened topsoil free of any stones large enough to impede grass growth, or that might damage or be thrown by a lawnmower covering the whole site. The Contractor will apply hydroseeding in a mix appropriate for local condition that would grow grass and prevent erosion. Hydroseeding shall be applied at a minimum rate of 5 pounds per 100 square feet. The driveway must be removed of all blacktop and gravel to support grass growth. Grading/seeding must be completed within 30 days of pulling the demolition permit unless impossible due to inclement weather. The Contractor will exercise caution so as to not damage any pedestrian sidewalk if present. If a sidewalk is damaged, the Contractor must repair or replace the damaged portion in a timely manner and prior to the Completion Date. The Contractor will provide before and after time/date stamped photos of sidewalk and property. The Contractor must contact the Land Bank's Engineer for a Final Inspection. Bid: The Finger Lakes Regional Land Bank Corporation is seeking bids for the demolition of the following properties. The Contractor should submit a price for each property and the number of days you anticipate air monitoring will be required on each site (you can bid 1/2 day increments if they will be on both sites in one day, but otherwise round up to full days). DEMOLITION OF 1473 Pleasant Street, Ovid, NY (Hamlet of Willard) 17 S Walnut Street, Waterloo, NY

Bid Results

Residential Subdivision

$41,000.00

Public - County

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
68
Bidding Soon
939
All Active Projects
537
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

November 30, 2024

img_map_placeholder

Multiple Locations, Waterloo, NY

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.