BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Elk Grove, California. Completed plans call for site work for a water / sewer project.

Any questions regarding the type of work to be done may be addressed to Ken Murray or Samsor Safi, at septic@sacsewer.com or (916) 875-1999. The bidder questions deadline is October 15, 2024 at 5:00 PM. ESTIMATED CONSTRUCTION COST: $ 22,500,000 CONTRACTOR LICENSE REQUIRED: Class A - General Engineering The work to be performed under this contract includes the furnishing of all labor, materials, tools and equipment for the Septic to Sewer Conversion Franklin & Hood (Project) located in the Franklin and Hood areas of Sacramento County, CA (location map shown in Drawings). The Project includes construction of the following items: o Construct approximately 38,818 linear feet of public and private sanitary sewer force main (which includes 9,860 linear feet of 1.25-inch through 4-inch HDPE pipe for the Franklin community and 28,958 linear feet of 1.25-inch through 6-inch HDPE pipe for the Hood community), complete, with cleanouts, valves, and incidentals. o Provide one (1) crossing of waterway by horizontal directional drilling (HDD) for the Franklin community and two (2) crossings of waterways by HDD for the Hood community. o Provide one (1) freeway crossing inside casing installed by HDD for the Hood community. o Provide one (1) railroad crossing inside steel casing installed by jack-and-bore (which is applicable to both the Franklin and Hood communities). o Construct approximately 1,299 linear feet of 8-inch VCP sanitary sewer with six (6) polymer concrete sanitary sewer manholes (which is applicable to both the Franklin and Hood communities). o Construct approximately 99 low pressure sewer (LPS) pump stations (which includes 31 LPS for the Franklin community and 68 LPS for the Hood community) on private SacSewer property complete with alarm panels and connection to house plumbing and existing electrical power supply, and with abandonment of existing septic systems. o Pavement restoration, restoration of landscaping and other surface improvements, mobilization, material acquisition and storage, permits, coordination, and other incidentals needed for a complete project. All Work associated with this contract must include, but is not limited to, mobilization/demobilization, dewatering of excavations, sheeting, shoring, and bracing of excavation, traffic control, erosion and sediment control, cleaning, debris removal and disposal, verification of pipe lengths and diameters, installation of PVC and VCP by open cut, installation of HDPE by open cut and horizontal directional drilling, installation of casing by boring and jacking, permitting, site restoration, and additional items or details that are required by the Contract Documents to be performed, placed, constructed or installed. Additional items or details not mentioned above but required by these specifications and drawings must be performed, placed, constructed, or installed in accordance with the Contract Documents. All work shall be completed as outlined in provided permit requirements. The successful bidder will achieve substantial completion of the Work by November 18, 2025. Each bid must be submitted on the bid forms provided in the Contract Documents. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the Treasurer of Sacramento County, or cash in an amount not less than ten percent (10%) of the aggregate sum of the bid. If a bid bond is utilized as the security, a current and effective power of attorney evidencing the authority of the officer, agent or representative who executed the bid bond on behalf of surety to execute, seal and deliver such bid bond. The successful bidder must be required to execute a Material and Labor Payment Bond and Performance Bond, issued by a corporate surety, acceptable to the Sacramento Area Sewer District, each for not less than one hundred percent (100%) of the contract price. Pursuant to the California Public Contract Code Section 22300, the contractor may, at its own expense, substitute securities for any money being withheld by the Sacramento Area Sewer District to ensure performance under this contract. The Board reserves the right to reject any or all bids, to waive any formality in any bid, and to determine which bid, in the judgment of the Board, is the lowest responsive bid of a responsible bidder.

Bid Results

Water / Sewer

$22,956,467.00

Public - City

Site Work

199

23

8

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
90
Bidding Soon
1,812
All Active Projects
755
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2024

December 30, 2024

img_map_placeholder

Hood Franklin Rd, Elk Grove, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.