EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 26, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a municipal facility in Chambersburg, Pennsylvania. Completed plans call for site work for a municipal facility.

As of October 25, 2024, this project has not yet been awarded. The project is expected to be awarded on january 27, 2025. The Borough of Chambersburg is accepting sealed bids for the Public Works Complex The Contract involves the competitive solicitation of the Public Works Complex. Bids will be based on a lump sum price to be paid out as monthly progress payments. The Town Council intends to award the Contract to the overall lowest responsible Bidder, as determined by Town Council to be in the best interest of the Borough of Chambersburg. All required Work, defined later herein, relates to the construction of seven buildings and associated site work comprising the Public Works Complex. A Proposal Bond in the amount of ten percent (10%) of the bidders maximum bid price is required to be accompanied with a Bid. A Performance Bond and Payment Bond each in the amount of one hundred percent (100%) of the contract price shall be required from the Successful Bidder. An anti-collusion affidavit is required for this Bid. The Contract will be subject to the Commonwealth of Pennsylvania Prevailing Wage Determination established by the Pennsylvania Department of Labor and Industry. Question Deadline 10/15/2024 at 1:00 PM ET While Bidders may make comments to clarify their bid, Bidders cannot change, modify, delete, alter, amend or make additions to the wording to any of the Bidding Documents, including but not limited to the Agreement and General Conditions. Unauthorized conditions, exceptions, limitations, or provisions attached to a Bid may be cause for rejection of the Bid. Any questions regarding the Bidding Documents shall be submitted as Requests for Interpretation and the Bidding Documents may only be modified by Addendum issued by the Borough prior to the Bid opening date. The Town Council of the Borough of Chambersburg reserves the rights to reject any or all Bids; to waive any defects, errors, omissions, irregularities or informalities in a Bid or the Bid procedure; and to accept any Bid which it may deem to be for or in the best interest of the Borough of Chambersburg. The Town Council reserves the rights to formally accept a Bid and award a Contract by public announcement at a regular meeting of the Town Council. The Borough of Chambersburg is an Equal Opportunity Employer. Minority and women owned business and those defined as SERB's under State regulations are encouraged to submit proposals.

Post-Bid

Municipal

$21,000,000.00

Public - City

Site Work

205

40

148

4

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Acceptance of Conditions, Field Engineering, Construction Layout, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Steep Slope Roofing, Shingles and Shakes, Roof Tiles, Roofing and Siding Panels, Membrane Roofing
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Panel Doors, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Postal Specialties, Storage Assemblies, Exterior Specialties, Protective Covers, Flagpoles
Division 11 - Equipment

Division 11 - Equipment

Residential Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops, Furnishings and Accessories, Rugs and Mats, Multiple Seating, Pews and Benches, Benches
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Other Conveying Equipment, Facility Chutes
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Identification for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts, Slings, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
85
Bidding Soon
1,712
All Active Projects
698
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

December 24, 2024

img_map_placeholder

Multiple Locations, Chambersburg, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Chambersburg Public Works Complex

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.