BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Goodyear, Arizona. Completed plans call for site work for a bridge / tunnel.

Northern Pkwy-SR101 Reinforced Concrete Box Culvert Extension The work consists of removing existing concrete channel, extending the existing reinforced concrete box culvert and constructing the irrigation flume. For this contract, a DBE goal of 10.82% is established for Disadvantaged Business Enterprises. This is a federally funded project and subject to Davis Bacon wage requirements. No Pre-Bidders Conference has been scheduled under this procurement. Q & A deadline: Oct 21, 2024 8:00:00 PM EDT Questions about the e-procurement platforms functionality must be directed to Periscope. Phone: 800-990-9339. Email: S2G-support@periscopeholdings.com. The contractor, sub recipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate. All Construction Work on This Contract is to Be Completed Within 180 Calendar Days Beginning With the Date Specified in the Notice to Proceed. Exclusive of and Following the Contract Time Allowed for Construction Work Are 120 Calendar Days for Internal Administrative Purposes Thereby Resulting in a Total Contract Performance Period of 300 Calendar Days MCDOT CONTRACT #2025-003 C-64-24-234-X-00

Post-Bid

Bridges / Tunnels

$177,000.00

Public - County

Site Work

25

8

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
22
Bidding Soon
702
All Active Projects
294
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2024

December 2, 2024

img_map_placeholder

Multiple Locations, Goodyear, AZ

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.