BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2024 at 8:00 PM

Updated October 31, 2024

Site work for a water / sewer project in Saint Peters, Missouri. Completed plans call for site work for a water / sewer project.

This work shall consist of clearing, grubbing, removing, and disposing of trees and vegetation within the limits of right-of-way and easement areas, except such vegetation as is designated to remain or to be selectively treated. This item shall also include removal and disposal of the trees and stumps designated on the plan to be removed. All stumps shall be removed in their entirety or ground as noted per the plan. The Contractor, as a part of this pay item shall legally dispose of all excess materials off-site. This item shall be constructed in accordance with Division 2 of the City of St. Peters Technical Specifications for Facilities Work in Public Right of Way, current edition. The last time for questions is before noon local time, October 16, 2024. The City of St. Peters is seeking bids for storm sewer infrastructure improvements in the Golden Hills Estates, Hermitage and Diekamp subdivisions that include the removal and installation of storm sewers and the addition of an emergency relief swale. The project will replace specific areas of undersized storm sewer system. Bidder hereby agrees to commence work under this contract on or after a date to be specified in a written "NOTICE TO PROCEED" of the owner and to fully complete the project within 165 calendar days, as stipulated in the specifications. Liquidated damages of $200.00 a day will apply. A bid bond in the amount of 5% (five percent) shall be submitted with each proposal. This project will be awarded to the lowest, responsive, responsible bidder. No 2nd tier subcontracting will be allowed on this project. The City reserves the right to waive any informality in bidding and to reject all bids. Question Deadline 10/16/2024 at 12:00 PM CT Direct All Inquiries to: bids@stpetersmo.net with 24-157 - P-31 Hermitage Storm Water Improvement Project in the subject line.

Bid Results

Water / Sewer

$850,342.00

Public - City

Site Work

14

5

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
116
Bidding Soon
1,313
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2024

November 27, 2024

Project location map

Hermitage Ln, Saint Peters, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.