Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 12, 2026 at 7:00 PM
Updated February 13, 2026
Site work and paving for a bridge / tunnel in Potosi, Missouri. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
(1): Job J5P3558 Route 8 WASHINGTON County. 3 Bridge deck replacements on Route 8, approximately 6 miles west of Route 185 over Allen Creek, over Mid Fork Fourche a Renault, over North Fork Fourche a Renault 6 miles west of Route 185 near Shirley, the total length of improvement being 0.18 miles. (2): Job J5S3557 Route 185 WASHINGTON County. Bridge deck replacement over Swan Branch 3.8 miles north of Route 8 near Potosi, the total length of improvement being 0.189 miles. (3): Job JCD0032 Route W WASHINGTON County. Bridge deck replacement over Ashley branch, 0.2 mile south of Route N, the total length of improvement being 0.095 miles. Range: $2.5M to $5M The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - D01 - 3 Bridge Deck Replacements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Bridges / Tunnels
$5,000,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 20, 2026
May 19, 2026
Multiple Locations, Potosi, MO
Related To This Project
Potosi, MO
Bid Date: Nov 19 2024
Potosi, MO
Bid Date: Nov 19 2024
Potosi, MO
Bid Date: Feb 10 2025
Potosi, MO
Bid Date: Feb 10 2025
Potosi, MO
Bid Date: Feb 10 2025
Potosi, MO
Bid Date: Feb 10 2025
Potosi, MO
Bid Date: Feb 10 2025
Potosi, MO
--
Potosi, MO
Bid Date: Oct 16 2024
Potosi, MO
Bid Date: Sep 18 2024
Potosi, MO
Bid Date: Sep 23 2024
Potosi, MO
Bid Date: Sep 20 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
