Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Rockwall, Texas. Completed plans call for site work for a water / sewer project.
Little Buffalo Creek Sanitary Sewer Extension As set forth in the plans and specifications, the project includes the following approximate quantities of work: 3,200 Linear Feet (LF) of 12- inch SDR-26 PVC Sanitary Sewer w/ Embedment by Open Cut 4,000 LF of 15-inch SDR-26 PVC Sanitary Sewer w/ Embedment by Open Cut 100 LF of 12-inch SDR-26 PVC Sanitary Sewer By Other Than Open Cut w/ 18-inch Steel Encasement Pipe (1/4-inch Wall) Nine (9) Pressure-Type Sanitary Sewer Manholes (5-foot to 6-foot diameter) Sixteen (16) Standard Sanitary Sewer Manholes (5-foot to 6-foot diameter) Abandonment of the Hickory Ridge Lift Station, including Cut, Plug & Abandonment of 1,600 LF 8-inch PVC force main in place. There will be no pre-bid conference for this project. If you have questions regarding the preparation of your bid, you may contact Misty Farris, Purchasing Agent, City of Rockwall, email: mfarris@rockwall.com. For technical questions send an email to Johnathan Browning, P.E., CFM, Assistant City Engineer, email: jbrowning@rockwall.com, assigned City Project Manager and Derek Chaney, P.E., R.P.L.S., email: dchaney@bhcllp.com, assigned Project Manager with the consulting engineer. Bidder must submit, with their Bid, and a Bid Bond from an approved surety company, in the amount of five percent (5%) of their Bid as a guarantee that the Bidder will enter into a contract and guarantee forms, if required, within 10 days after notice of award of contract. The successful bidder must furnish Performance Bond and Payment Bond, each in the amount of one hundred percent (100%) of the contract price, from an approved Surety company holding a permit from the State of Texas to act as surety, and acceptable according to the latest list of companies holding Certificates of Authority from the Secretary of the Treasury of the United States, or another Surety acceptable to the City. A ten percent (10%) Maintenance Bond (2- year) is required for this project. The right is reserved by the City of Rockwall to reject any and all bids.
Bid Results
Water / Sewer
$1,873,373.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 22, 2024
December 2, 2024
Multiple Locations, Rockwall, TX
Related To This Project
Rockwall, TX
--
Rockwall, TX
--
Rockwall, TX
--
Rockwall, TX
--
Rockwall, TX
Bid Date: Oct 29 2024
Rockwall, TX
Bid Date: Nov 14 2024
Rockwall, TX
Bid Date: Nov 06 2024
Rockwall, TX
--
Rockwall, TX
--
Rockwall, TX
Bid Date: Oct 03 2024
Rockwall, TX
--
Rockwall, TX
Bid Date: Oct 01 2024
Rockwall, TX
--
Rockwall, TX
Bid Date: Sep 25 2024
Rockwall, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.