Published October 21, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Dayton, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This item shall consist of furnishing, preparing and systematically applying a polymerized bituminous emulsion, aggregates and asphalt concrete to concrete pavement fractures, joints and imperfections as specified in the proposal. The applied materials shall completely fill the entire cavity and provide an aggregate wearing surface. Roadway, Landscape and Irrigation Improvements. kettering specifies the scope of work by determining ramp type, configuration, and extent of work. the contractor may have to add additional quantities to achieve desired slopes as directed by kettering Davis-Bacon Prevailing Wages Construction Completion Date: 9/5/2025+ Project Engineer: Chad Ingle PE, PS Contract Award and Notice to Proceed will be 30-60 days after Bid Opening Question Deadline 10/14/2024 at 8:00 AM ET Questions after the Q&A deadline should be sent to ketteringengineering@ketteringoh.org All technical questions regarding the bid specifications should be directed through the Q&A funtion on this bid. City of Kettering - 3600 Shroyer Road- Kettering, OH 45429 ketteringengineering@ketteringoh.org Only ODOT pre-qualified contractors are eligible to submit bids for this Project. Pre-qualification status for the work to be performed must be in force at the time of bid submission, at the time of award, and through the life of the construction contract. Subcontractors are not subject to the prequalification requirement. The "prime" contractor must perform no less than thirty percent (30%) of the total original contract price. The City of Kettering reserves the right to hold all bids for sixty (60) days unless extended by the City; or unless, within forty-eight (48) hours prior to the published time for the opening of bids, excluding Saturdays, Sundays, and legal holidays, any modification of the plans or specifications for the project for which bids are solicited is issued through Bid Express or mailed or otherwise furnished to persons who have obtained plans or specifications for the project, for which the time for opening of bids shall be extended one (1) week, and to reject any and all bids. ***Prebid meeting: One tap mobile +13092053325,,85135936402#,,,,*826254# US +13126266799,,85135936402#,,,,*826254# US (Chicago) --- Dial by your location o +1 309 205 3325 US o +1 312 626 6799 US (Chicago) o +1 646 558 8656 US (New York) o +1 646 931 3860 US o +1 301 715 8592 US (Washington DC) o +1 305 224 1968 US o +1 253 205 0468 US o +1 253 215 8782 US (Tacoma) o +1 346 248 7799 US (Houston) o +1 360 209 5623 US o +1 386 347 5053 US o +1 507 473 4847 US o +1 564 217 2000 US o +1 669 444 9171 US o +1 669 900 9128 US (San Jose) o +1 689 278 1000 US o +1 719 359 4580 US Meeting ID: 851 3593 6402 Passcode: 826254 Engineer's Estimate: $1,200,000 THIS PROJECT INVOLVES ASPHALT PAVEMENT REPAIR AND RESURFACING OF GOVERNORS PLACE BLVD. ADDITIONAL WORK SHALL INCLUDE THE CONSTRUCTION OF BRICK PAVER CROSSWALKS, CURB RAMPS, CONCRETE SIDEWALKS, DRIVE APPROACHES. CURB REPAIR, AND ASSOCIATED FLAT WORK. ADDITIONALLY, GRADING, EARTHWORK, LANDSCAPING, AND RECONSTRUCTION OF THE EXISTING BRICK PATIO WITHIN THE MEDIANS WILL OCCUR ON A PORTION OF THE MEDIANS WITHIN THE PROJECT LIMITS.

Bid Results

Roads / Highways

$948,269.00

Public - City

Paving, Site Work

44

14

8

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 12 - Furnishings

Division 12 - Furnishings

Other Furnishings, Site Furnishings
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Watering, Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Concrete Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Hoists, Lifting Devices, Lifts, Material Storage, Bulk Material Storage, Material Storage Tanks

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
69
Bidding Soon
1,284
All Active Projects
553
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Governor's Place Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.