BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2025 at 8:00 PM

Updated October 29, 2025

Site work and paving for a road / highway in Ankeny, Iowa. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Reconstruction and extension of NE 18th Street from NE Delaware Avenue across Interstate 35 to approximately 225 feet east of NE Frisk Drive. The new roadway will include a bridge over Interstate 35, a pedestrian bridge over Four Mile Creek, 8-ft. wide sidewalk on the south side, streetlighting, and storm sewer. The existing roadway bridge over Four Mile Creek that was recently replaced by Polk County will be used as constructed. The overall project would be constructed with three separate bid packages as follows: Phase 1 (2027) - vegetation clearing and embankment construction Phase 2 (2028) - I-35 bridge construction and Four Mile Creek pedestrian bridge construction Phase 3 (2029) - NE -18th Street roadway and storm sewer construction. The proposed project schedule assumes: Topographic survey, initial environmental (NEPA) documentation, and initial preliminary design in 2025 Additional environmental (NEPA) documentation and additional preliminary design in 2026 Final design of Phase 1, final design of Phase 2, right-of-way acquisition, construction of Phase 1, and construction engineering of Phase 1 in 2027 Final design of Phase 3, construction of Phase 2, and construction engineering of Phase 2 in 2028 Construction of Phase 3 and construction engineering of Phase 3 in 2029. It is anticipated that all three construction projects would be bid through the Iowa DOT letting process. The City anticipates applying for STBG funding for the bridge project through the Des Moines Area MPO. The City also anticipates requesting funding from the Iowa DOT. The project is included in the City's 2025-2029 Capital Improvement Program (CIP). As of October 29, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$7,050,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
103
Bidding Soon
1,158
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2029

Project location map

NE 18th St, Ankeny, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.