Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published January 6, 2025 at 7:00 PM
Updated January 7, 2025
Renovation of a data center facility in Bloomington, Illinois. Completed plans call for the renovation of a data center facility.
As of October 22, 2024, this project has not yet been awarded. A timeline for award has not yet been established. This project includes but is not limited to the following Disconnect and remove two existing data center cooling unit air handlers in two different data rooms Removal of existing data air unit rooftop chilling units. Sealing of existing chiller piping during replacement to prevent infiltration of debris or contaminants. Installation of new data center air handlers and air-cooled chiller units at same locations as existing units. Replacement of two chiller unit glycol injection pumps located on the roof. Conduct replacement installation in a way that minimizes down time of the cooling systems in every way possible. Additional option proposal to remove 2nd floor data center cooling unit completely and replace with minisplit HVAC system due to planned minimal heat load in the future of this area. Pressure test of existing chiller lines to ensure they are free of any potential leaks and repair of any leaks found. (No known leaks at this time.) All equipment, materials, tools and equipment needed to perform the scope of work will be the awarded contractors responsibility to supply. Questions will be entertained after this pre-submission conference until Wednesday, October 9 th, @ 4:00pm (CST) The Owner reserves the right to reject any or all Proposals, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional proposals. The Owner further reserves the right to reject the proposal of any Submitter whom it finds, after reasonable inquiry and evaluation, to not be responsible.
Post-Bid
Data Centers
$400,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 17, 2024
November 18, 2024
115 E Washington St, Bloomington, IL
Related To This Project
Bloomington, IL
Bid Date: Oct 10 2024
Bloomington, IL
Bid Date: Oct 29 2024
Bloomington, IL
Bid Date: Nov 12 2024
Bloomington, IL
Bid Date: Dec 12 2024
Bloomington, IL
Bid Date: Dec 04 2024
Bloomington, IL
Bid Date: Nov 26 2024
Bloomington, IL
Bid Date: Nov 20 2024
Bloomington, IL
--
Bloomington, IL
Bid Date: Sep 30 2024
Bloomington, IL
Bid Date: Sep 30 2024
Bloomington, IL
Bid Date: Sep 30 2024
Bloomington, IL
--
Bloomington, IL
Bid Date: Sep 30 2024
Bloomington, IL
Bid Date: Sep 30 2024
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed