Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in San Antonio, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Project construction may include but is not limited to: concretThe consultant's construction estimated for this contract is: $425,000.00 CoSA: $402,800.00 SAWS: $15,600.00 CPS Energy: $6,600.00e curbs, sidewalks, driveways, concrete retaining walls-combination type, wheel chair ramps, minor asphalt milling and replacement, topsoil, sodding, striping, elevated sidewalks, sidewalk pipe railing, adjusting existing meter boxes, valve boxes and manholes, tree pruning, removal and/or replacement, and any other items required due to the site conditions to accomplish the project scope. Question Deadline 10/11/2024 at 4:00 PM CT The City of San Antonio point of contact for this solicitation is Procurement Specialist II, Renuka Naidu, Renuka.Naidu@sanantonio.gov. Questions are to be submitted in writing in the Questions and Answers section online It is understood and agreed that the work is to be substantially completed on or before 270 calendar days. This project does not include hazardous environmental work. This project requires 10 project signs. Wage Decision - Bidder shall meet the prevailing wage rate requirements established for this contract and shall reference the wage decision posted with this solicitation on the City's website. Veteran-Owned Small Business Preference Program - For more detailed information on the Veteran-Owned Small Business Preference Program, see Ordinance No. 2013-12-05-0864 and solicitation document "040 Standard Instructions to Respondent", section 6. Small Business Economic Development Advocacy (SBEDA) Program Compliance - Respondents shall meet the subcontracting requirements as stated on 050.01 Form and on the Subcontractor/Supplier Utilization Commitment Form posted with this solicitation on the City's website. The Subcontractor/Supplier Utilization Commitment Form will be determined off of the base bid amount.
Bid Results
Sidewalks / Parking Lot
$512,777.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 29, 2024
November 28, 2024
Multiple Locations, San Antonio, TX
Related To This Project
San Antonio, TX
Bid Date: Oct 24 2024
San Antonio, TX
--
San Antonio, TX
Bid Date: Oct 30 2024
San Antonio, TX
--
San Antonio, TX
Bid Date: Oct 16 2024
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
Bid Date: Oct 25 2024
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.