BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of an educational facility in Bryceville, Florida. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; and for site work for a educational facility.

The project consists of constructing a new cooler/freezer and removing the current cooler/freezer. Minor interior work, not limited to patching, painting, electrical, will be required to accommodate both the new construction and demolition. Project Location: 6504 Church Avenue, Bryceville, Florida 32009. Bid security shall be submitted with each bid in the amount of [5] percent of the bid amount. No bids may be withdrawn for a period of [60] days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. The successful bidder will be required to provide a Performance, Labor, and Material Bond in the amount of 100% of the accepted Bid amount. No bidder may withdraw his bid within (60) days after the actual date of the opening thereof. Any actual or prospective bidder who disputes the reasonableness or competitiveness of the terms and conditions of the Invitation To Bid, Contract Award, or Recommendation for Contract Award, shall file a Notice of Protest with the Superintendent of Schools within 72 hours of receipt of the bid solicitation, posting of the bid tabulations, or posting of the bid award, and must file a formal written protest within ten (10) days following the filing of the Notice to Protest. Failure to observe such timelines will constitute a waiver of proceedings and of right to protest as stipulated in Chapter 120 of the Florida Statutes. The School Board requires a protestor to post bond in accordance with Florida Statutes The Owner reserves the right to waive any irregularities and minor technicalities or to reject any and all bids. Each bidder must deposit with his bid, a Bid Bond or Cashier's Check in the amount of five percent (5%) of the Base Bid price, payable to the Owner. Construction is expected to begin on November 01, 2024. Project completion is expected prior to February 28, 2025.

Post-Bid

Educational

$250,000.00

Public - County

Demolition, New Construction, Site Work

10

15

15

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
36
Bidding Soon
655
All Active Projects
283
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2024

November 1, 2024

img_map_placeholder

6504 Church Ave, Bryceville, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.