BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Hemet, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

2022/23 Citywide Pavement Rehabilitation The scope of work generally consists of but is not limited to full depth reclamation of pavement and base, grind and overlay, construction of new asphalt overlays, traffic loops replacement, adjust valve caps & manhole rims to finished surface, remove & replace AC dikes, replace striping and markings, all as shown on the attached approved plans and specifications. The work to be constructed is located on the following streets and limits: o Portion of Park Ave. from Dartmouth St. to Meridian St. (Full Depth Reclamation +- 3,000 L.F.) o Portion of Devonshire Ave. from Monte Vista Way. to Columbia St. (Full Depth Reclamation +- 2,950 L.F.) o Portion of Lincoln Ave. from Kupfer Dr. to Zolder St. (Grind & Overlay +- 1,200 L.F.) o Portion of Fruitvale Ave. from Via Linda Dr. to Lyon Ave. (Full Depth Reclamation +- 4,450 L.F.) o Portion of Commonwealth Ave. from Lyon Ave. to Kirby St. (Full Depth Reclamation +- 2,550 L.F.) o Portion of Lyon Ave. from Acacia Ave. to Whittier Ave. (Grind & Overlay +- 2,500 L.F.) o Portion of Johnston Ave. from Lilac St. to Elk St. (Full Depth Reclamation +- 2,100 L.F.) o Portion of Johnston Ave. from Elk St. to State St. (Grind & Overlay +- 4,000 L.F.) o Portion of State St. from Stetson St. to Mayberry Ave. (Full Depth Reclamation +- 3,900 L.F.) o Portion of State St. from Mayberry Ave. to Kimball Ave. (Grind & Overlay +- 2,050 L.F.) o Portion of Acacia Ave. from Lyon Ave. to Kirby St. (Grind & Overlay +- 2,550 L.F.) o Portion of Thornton Ave. from Sanderson Ave. to Cawston Ave. (Full Depth Reclamation +- 2,550 L.F. o Portion of Gilbert St. from Stetson Ave. to Chambers St. (Full Depth Reclamation +- 2,600 L.F.) Total: 36,400 L.F. The following streets and limits are potential additives for this project. o Portion of Fruitvale Ave. from Sanderson Ave. to Via Linda Dr. (Full Depth Reclamation +- 800 L.F.) o Portion of Gilbert St. from Stetson Ave. to Chambers St. (Full Depth Reclamation +- 850 L.F.) o Portion of Cawston Ave. from Industrial Ave. to Hollyvale Ln. (Full Depth Reclamation +- 2,400 L.F.) Total: 4,050 L.F. Liquidated Damages $2,000 per day Start/Delivery Date 11/18/2024 Project Duration 150 Working Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 10/08/2024 at 3:00 PM PT Online Q&A Yes Budget is $5,000,000

Award

Roads / Highways

$7,971,631.00

Public - City

Paving, Site Work

36

8

4

6

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
88
Bidding Soon
1,761
All Active Projects
839
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

November 18, 2024

img_map_placeholder

Multiple Locations, Hemet, CA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.