BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a municipal facility in Chino, California. Completed plans call for the renovation of a municipal facility.

Carpet Removal and Installation Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Project Type Bid Response Types Line Items Subcontractor Bid Bond W9 (required) Bid Bond (required) Type of Award Lump Sum Question Deadline 10/04/2024 at 11:00 AM PT Online Q&A Yes 1. Project Overview: This project involves removing and replacing carpet flooring in two office buildings A & B located at 6075 Kimball Avenue, Chino, CA 91708. The selected contractor must provide all labor, materials, and equipment necessary to complete the project according to the specifications below. All products and materials used must be from the manufacturer's recommended specifications. 2. Locations: a. Building A: Approx. 22,650 square yards of carpet b. Building B: Approx. 16,500 square yards of carpet 3. Tasks: a. Removal: i. Remove existing carpet from both buildings. ii. Properly dispose of all removed materials according to local regulations. b. Sub-Floor Preparation: i. Skim coat sub-floor surfaces for both buildings. ii. Apply MoistureTek Prime as needed for moisture concerns. c. Installation: i. Install 18" x 36" modular carpet tiles (style: Patcraft: Color Variance_River RockStagger). ii. Install Carbon Rubber Cove Base, 4" height (Approximately:1,600 LF in Bldg. B, 2,100 LF in Bldg. A). iii. Apply pressure-sensitive adhesive. iv. Install transitions (approx. 108 LF for both buildings). d. Additional Work: i. Include base transitions and cover base adhesive where necessary. ii. Use QuikFill to address minor sub-floor imperfections (2 units per building). 4. Access and Site Conditions: a. The contractor will have access to the site during regular working hours Monday - Friday 7:00 am - 4:00 pm. Work outside of these hours may be arranged with prior approval. b. Parking arrangements for contractor vehicles and material deliveries will be provided onsite. c. Subfloor testing for moisture and alkalinity (in accordance with ASTM F2170) must be completed by the contractor, as specified in the final agreement. 5. Material Specifications: a. All carpet materials must meet the project specifications, using 18" x 36" modular carpet tiles (Patcraft: Color Variance_River Rock-Stagger) as outlined. 6. Warranty and Quality Standards: a. The contractor must provide a 1-year warranty on installation and follow manufacturer warranties for materials. b. All work must comply with industry standards, including ASTM standards for carpet installation and sub-floor preparation. 7. Cleanup and Waste Removal: a. The contractor is responsible for daily cleanup of the work area and removal of all waste. b. Waste disposal will be the contractor's responsibility. 8. Interested contractors should provide: a. A detailed breakdown of costs for each building. b. Cost per square foot. c. Estimated project timeline with key milestones.

Award

Municipal

$307,390.00

Public - City

Renovation

6

8

6

3

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
103
Bidding Soon
2,237
All Active Projects
1,007
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2024

December 1, 2024

img_map_placeholder

6075 Kimball Ave, Chino, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.