Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 1, 2024 at 8:00 PM
Updated October 2, 2024
Site work for a water / sewer project in Fair Oaks, California. Conceptual plans call for site work for a water / sewer project.
Project Location: Blue Oak Drive, Madison Avenue, and Winding Oak Drive in Fair Oaks, CA 95628. FOWD has a network of existing transmission main piping that has been identified for replacement as part of a multi-year capital improvement program. This project encompasses Phase I of the planned transmission main replacement. Design services for the project are scheduled to be completed by January 31, 2025, and construction will follow thereafter. For Section A, approximately 2,180 linear feet of 24-inch ductile iron pipe will be installed to replace the existing 30-inch steel main. Alignment of the new main will begin on Blue Oak Drive at Brome Court and travel northwest to Madison Avenue. It will then continue southwest along Madison Avenue, terminating at Winding Oak Drive. This section includes one connection point to the existing transmission main at Brome Court, which is constructed of newer ductile iron pipe. For Section B, approximately 1,200 linear feet of 24-inch ductile iron pipe will be installed to replace the existing 30-inch steel main. Alignment of the new main will begin on Blue Oak Drive at Madison Avenue and travel southwest along Blue Oak Drive, terminating past Great Dome Court. This section includes one connection point to the existing transmission main past Great Dome Court, which is constructed of newer ductile iron pipe. Question Deadline 10/01/2024 at 3:00 PM PT Inquiries about this RFQ shall be submitted in writing and directed to: Blake Chetcuti Associate Engineer Phone: (916) 844-3520 Email: bchetcuti@fowd.com. The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
$2,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 8, 2025
Multiple Locations, Fair Oaks, CA
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed