BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 6, 2025 at 7:00 PM

Updated January 7, 2025

Demolition, site work, asbestos abatement and new construction of an educational facility in Massillon, Ohio. Working plans call for the demolition of a educational facility; for the construction of a 156,358-square-foot educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.

A. Project Description o Total Project Budget is $62,253,023 M o Build a New 5-8 Perry Middle School to house approximately 1,230 students. The overall total 5-8 MS building is to be approximately 156,358 sf for 1,230 students. Total co-funded budget for this portion of the project is approximately $59.8M, not including LFIs. oThere are currently no anticipated LFI for this project. o Abatement & Demolition of the existing Pfeiffer Middle school (located at 4315 13th Street SW, Massillon, Ohio 44710) with a total co-funded budget of approximately $1.0 M. o Abatement & Demolition of the existing Edison JHS (located at 4201 13th Street SW, Massillon, Ohio 44710) with a total co-funded budget of approximately $1.4 M. o This project will follow LEED v4 criteria. o The district has already opted out of providing a Storm Shelter per the latest OBBC requirements. o The Architect/Engineer ("A/E") will prepare the POR for this project. B. Scope of Services Upon award of the Agreement, commence by developing the Program of Requirements. The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner's project requirements. Participate in the Encouraging Diversity, Growth& Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types. CM Preconstruction Services Start - 01/25 Construction Stage Notice to Proceed - 02/26 Substantial Completion of all Work - 06/28 CM Services Completed - 01/29 Pre-Proposal Meeting (Virtual) 12-19-2024

Final Planning

Educational

$62,253,023.00

Public - City

Asbestos Abatement, Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
258
Active Projects
130
Bidding Soon
2,350
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

July 4, 2025

Project location map

Multiple Locations, Massillon, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.