BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, asbestos abatement and new construction of an educational facility in Massillon, Ohio. Completed plans call for the demolition of a educational facility; for the construction of a 156,358-square-foot educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.

A. Project Description o Total Project Budget is $62,253,023 M o Build a New 5-8 Perry Middle School to house approximately 1,230 students. The overall total 5-8 MS building is to be approximately 156,358 sf for 1,230 students. Total co-funded budget for this portion of the project is approximately $59.8M, not including LFIs. oThere are currently no anticipated LFI for this project. o Abatement & Demolition of the existing Pfeiffer Middle school (located at 4315 13th Street SW, Massillon, Ohio 44710) with a total co-funded budget of approximately $1.0 M. o Abatement & Demolition of the existing Edison JHS (located at 4201 13th Street SW, Massillon, Ohio 44710) with a total co-funded budget of approximately $1.4 M. o This project will follow LEED v4 criteria. o The district has already opted out of providing a Storm Shelter per the latest OBBC requirements. o The Architect/Engineer ("A/E") will prepare the POR for this project. B. Scope of Services Upon award of the Agreement, commence by developing the Program of Requirements. The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner's project requirements. Participate in the Encouraging Diversity, Growth& Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types.

GC Bidding

Educational

$62,253,023.00

Public - City

Asbestos Abatement, Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
62
Bidding Soon
1,104
All Active Projects
425
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

August 5, 2025

img_map_placeholder

Multiple Locations, Massillon, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.