EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 1, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Pittsburgh, Pennsylvania. Completed plans call for site work for a water / sewer project.

Questions Due Date: October 22, 2024 by 4:00 p.m. The Pittsburgh Water and Sewer Authority (PWSA) is requesting bids for the Municipal Separate Storm Sewer System (MS4) Compliance Stream Bank Stabilization & Restoration Project, it consists of two similar projects at two different locations. One, Glass Run Stream Restoration, is on public land in the Hays neighborhood along Glass Run Road. And the second, an Un-Named Tributary (UNT) to Chartiers Creek Stream Restoration, is on a private parcel in the Fairywood neighborhood. The Glass Run Stream Restoration Project will meet the MS4 Pollution Reduction Plan (PRP) requirements in accordance with our NPDES Permit No. PAI136133 in which the City of Pittsburgh is a co-permittee. The Glass Run project site is located along Glass Run Road on City of Pittsburgh property. This project aims to restore 350 linear feet of stream via ecologically engineered systems that best emulate natural stream channel structures and provide lasting stability. Stabilization matting will be placed along the bottom of the stream channel and Log Sills and Toe Wood structures will be installed using rock and tree materials repurposed from the site. There will be tree removal, site grading, and cut and fill slopes associated with this project. An existing 18 VCP sanitary sewer located within the project area will be encased in concrete for 173 linear feet where it crosses the proposed stream channel. The proposed stream restoration will reestablish appropriate dimension, pattern, and profile of Glass Run stream within the project reach and reconnect the system to the floodplain thereby reducing the sediment flowing into the downstream waterways by 40,250 lbs per year. The UNT Chartiers Stream Restoration Project will meet the MS4 Pollution Reduction Plan (PRP) requirements in accordance with our NPDES Permit No. PAI136133 in which the City of Pittsburgh is a co-permittee. The UNT Chartiers project site is located off Broadhead Fording Road on private property operated by Giant Eagle Corporation. An easement has already been secured with the owner for construction and long-term O&M. This project aims to restore 450 linear feet of the stream utilizing ecologically engineered systems that best emulate natural stream channel structures and provide lasting stability. Stabilization matting will be placed along the bottom of the stream channel. Log Sills and Toe Wood structures will be installed using rock and tree materials repurposed from the site. Rock Cross Vane structures will be installed to mitigate stream flow rates across elevation changes, creating ripple pools along the channel. There will be tree removal and site grading associated with this project. The proposed stream restoration will reestablish appropriate dimension, pattern, and profile of the UNT Chartiers Creek within the project reach and reconnect the system to the floodplain thereby reducing the sediment flowing into the downstream waterways by 51,750 lbs per year. Good Morning, PWSA highly encourages bidders interested in submitting a bid for this solicitation to attend. If you would like to attend, please copy and paste the link into your browser. Thanks! Link: https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZTcyNDFjNzQtNjU4Mi00NzhmLWI3ZDMtNzkzODFiYmVlMDU5%40thread.v2/0context=%7b%22Tid%22%3a%22bbb0cd8b-73d0-4166-b8c0-8a863755153f%22%2c%22Oid%22%3a%22eb6cf683-4b8b-478f-be0f-ff8581769553%22%7d Meeting ID: 219 640 614 437

Bid Results

Water / Sewer

$657,621.00

Public - City

Site Work

63

22

75

8

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Structure Moving
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Rigid Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment, Packaged Water Treatment, Packaged Water Treatment Plants

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
101
Bidding Soon
999
All Active Projects
471
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2024

December 2, 2024

img_map_placeholder

Multiple Locations, Pittsburgh, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Storm Sewer System (MS4) Compliance Stream Bank Stabilization & Restoration

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.