BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2024 at 7:00 PM

Updated December 5, 2024

Site work and renovation of a mixed-use development in Albuquerque, New Mexico. Working plans call for the renovation of a development.

As of December 4, 2024, no bids received. The last day for questions is close of business (5:00 pm local time) Thursday, November 14, 2024. The project includes removal of an existing settling pond and aeration lagoon, removal, hauling and disposal of liquid and sludge, removal and disposal of equipment, structures and HDPE liners, construction of an emergency storage pond with HDPE liner, construction of PVC pipeline, grading and seeding, and installation of restroom facilities. Prior to the execution of the Contract by the Bernalillo County Commission, the successful Contractor shall furnish separate surety bonds each in the amount of one hundred percent (100%) of the total Contract price, including Gross Receipts Tax, as security for the faithful performance of the Contract and for the payment of all labor and materials. The sureties on such bonds shall be duly authorized to conduct business in the State of New Mexico, approved in Circular 570 as published by the U.S. Treasury Department, and acceptable to Bernalillo County. The cost for furnishing these bonds is incidental to the contract and no separate payment shall be made therefor.

Final Planning

Water / Sewer

$470,000.00

Public - County

Renovation, Site Work

22

8

2

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
10
Bidding Soon
249
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

December 19, 2024

Project location map

100 Deputy Dean Miera Dr SW, Albuquerque, NM


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.