Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving, new construction and addition to a bridge / tunnel in Alexandria, Virginia. Conceptual plans call for the addition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
This project will construct multimodal improvements to the South Van Dorn Street bridge between Metro Road and Courtney Avenue to accommodate a dedicated transit lane for the future West End Transitway and improve non-motorized facilities (i.e. sidewalk, cycle track) along the bridge for better connections between new developments to the north and south, transit stops/stations, and the Van Dorn Metrorail station. The conceptual plan for the full build-out from 2016 of the transitway included a dedicated bus lane on South Van Dorn Street, and the plan maintained existing vehicle travel lanes. The Eisenhower West Small Area Plan (EWSAP) also recommends multimodal improvements to the South Van Dorn Street bridge. In 2023, the City finalized a feasibility study that assessed traffic impacts for different options from the EWSAP, including a multi-modal bridge east of South Van Dorn Street, and a smaller bridge west of South Van Dorn Street. This project supports the West End Transitway, planned development for the area, and improved multimodal connections to the Metrorail station and new activity centers in the Eisenhower Valley. NVTA awarded the City funds to design this portion of the transitway for FY 2026, which includes structural, civil and traffic engineering design and analysis, as well as community engagement, environmental work, staff time, and contingency funds. As of September 30, 2024, This project is included in the city's 2025-2034 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$15,000,000.00
Public - City
Addition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
S Van Dorn St, Alexandria, VA
Related To This Project
Alexandria, VA
--
Alexandria, VA
--
Alexandria, VA
--
Alexandria, VA
--
Alexandria, VA
--
Alexandria, VA
--
Alexandria, VA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.