BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Peoria, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The proposed project officially known as Moss Avenue Reconstruction includes reconstruction of 1.1 miles of Moss Avenue between Western Avenue and Sheridan Road. The work includes installation of 6,310 feet of 8" watermain; 5,430 linear feet of storm sewers; 71 drainage structures; 26,900 square feet of porous concrete pavers as a parking lane; 2,180 square yards of concrete driveway aprons; 20,000 square feet of sidewalk replacement; 11,930 linear feet of concrete curb and gutter; 6,700 tons of asphalt pavement; and all the appurtenant aggregates, removals, traffic control, and restoration. i. Proposed improvement is officially known as Moss Avenue Reconstruction. ii. The proposed improvement consists of reconstruction of Moss Avenue between Western Avenue and Sheridan Road. The work will include 8" watermain, storm sewers, inlets, manholes, porous concrete pavers as a parking lane, concrete driveway aprons, some sidewalk replacement, concrete curb and gutter, and asphalt pavement. Before plans and specifications are delivered, contractors must be pre-qualified. All proposals must be accompanied by cash, certified check, cashier's check, or a bid bond for not less than five percent (5%) of the amount of the bid. The successful bidder will be required to furnish a satisfactory Performance Bond for the full amount of the contract, with sureties, to be approved by the City Engineer. Compliance with the Illinois Prevailing Wage Act is required under this contract. Prime Contractors have an obligation to make a good faith effort to advance the City's commitment to increase diversity among the firms working on City construction projects. The City of Peoria reserves the right to waive technicalities and to reject any or all proposals. 1. Eighteen (18) percent of the total hours worked, per trade, should be performed by minority workers. 2. Three (3) percent of the total hours worked, per trade,should be performed by female workers. Work shall be completed by November 20, 2026

Post-Bid

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

207

14

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
33
Bidding Soon
582
All Active Projects
283
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.