Published November 7, 2024 at 7:00 PM

Updated November 8, 2024

Site work for a water / sewer project in Bryant, Arkansas. Completed plans call for site work for a water / sewer project.

The work to be done under this contract is as shown on the Plans and as provided for in these Specifications, and shall include the furnishing of all materials, equipment, tools and supplies and performing all labor in the construction of work generally as follows 600 linear feet of various sized culverts, 8 storm drainage structures, and other appurtenances. Project: Stillman Loop Drainage Improvements-Phase 2 for furnishing all tools, materials and labor,and performing the construction of approximately 600 linear feet of various sized culverts, 8 storm drainage structures, and other appurtenances. The contractors shall make such inspection and studies of the site of the work as to familiarize themselves with all conditions to be encountered. Each bid must be accompanied by an acceptable statement of bidder's qualifications. The requirements of the bidder's statement of qualifications will be furnished to prospective bidders with plans and specifications. Each bid must be accompanied by an acceptable form of bid guaranty in the amount equal to atleast five percent of the whole bid, and such bid bond or cashier's check shall be subject to the conditions provided in the Instructions to Bidders. Bids must be made upon the official bid sheets contained in the specifications, and such bid sheets SHALL NOT be removed from the remainder of the Specifications and Contract Documents. All bids shall be sealed and the envelopes addressed to Tim Fournier, Public Works Director, 1017 SW 2nd Street, Building3, Bryant, Arkansas 72022. All bids shall be plainly marked on the outside of the envelope specifying that it is a sealed bid for Stillman Loop Drainage Improvement - Phase 2, the time for opening of bids, and the name and current contractor's license number of the bidder. Bidders are required to have a contractor's license under the terms of Act 150, Arkansas Acts of 1965, as amended. The Owner reserves the right to reject any and all bids and to waive any informalities in the proposal deemed to be in the best interests of the Owner. The Owner further reserves the right to withhold the awarding of the contract for a period not to exceed 60 days after the receipt of bids.

Award

Water / Sewer

$461,242.00

Public - City

Site Work

8

10

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
22
Bidding Soon
273
All Active Projects
116
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.