BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2025 at 8:00 PM

Updated May 3, 2025

Site work and paving for a civil project in Albuquerque, New Mexico. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Unser Blvd./Paseo Del Norte Widening project (CN A300305) involves the upgrade of two major roadways. The Unser Boulevard Phase 1 Project extends from just south of PDN to Paradise Blvd, approximately 1.6 miles in length. The Paseo Del Norte Boulevard Phase 1 Project extends from just west of Unser Boulevard to just east of Calle Nortena, approximately 1.506 miles in length. The intent of the overall project is the to widen both roadways from 2-lanes to a 4-lane divided roadway with buffered bike lanes and multi-use trails. Other key features of the project are as follows: 1. Storm Drain 2. Traffic Signals 3. ITS systems 4. Lighting 5. ADA ramps 6. Unser Pond Construction All General Contractors and Subcontractors are required to be prequalified at the time of bid pursuant to the Contractor Prequalification Rule 18.27.5 NMAC. All Prime Contractors shall be prequalified with the NMDOT no later than seven calendar days prior to bid opening; All Subcontractors shall pre-qualified with the NMDOT prior to performing any work; the Prequalification Packet is located at Online.

Award

Roads / Highways

$10,000,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
1
Bidding Soon
181
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2025

May 12, 2025

Project location map

Paseo Del Norte NW & Unser Blvd NW, Albuquerque, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.