BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Riverton, Utah. Completed plans call for the renovation of a fire / police facility.

The department budgeted $50,000 for this project. Remove and replace windows in Fire Station 121, 4120 West 12600 South. There are 23 windows, each window is 4' wide x 5' tall. Windows are to be heavy, reinforced, multi-chambered, insulated vinyl frames, red color on the outside, tan color on the inside, horizontal and vertical grid; Cardinal high performance, double pane, LoE-i89 glass; installed with weather stripping to make air tight seal, includes Flex screens. This fire station is not accessible. Schedule an appointment with Craig Calvert to inspect, 801-208-3175. Technical questions about this project or the specifications should be directed to Craig Calvert at ccalvert@rivertonutah.gov. Time is the essence of the Contract Documents. Contractor agrees that the City will suffer damage or financial loss if the project is not completed on the agreed completion time or within any time extensions that are allowed by written pre approval. The Contractor and the City agree that proof of the exact amount of any such damage or loss is difficult to determine. Accordingly, instead of requiring any such proof of damage or specific financial loss or late completion, the Contractor agrees to pay the following sums to the City as liquidated damages and not as a penalty. a) Late Time Completion: five hundred dollars and no cents ($500.00) for each day or part thereof that expires after the completion time until the work is accepted as substantially complete. b) Late Punch List Time: Punch list items must be completed within 7 calendar days after the list is delivered. 50% of the amount specified for Late Time Completion for each day or part thereof if the work remains incomplete after the Punch List Time. The Punch List shall be considered delivered on the date it is transmitted by facsimile, hand delivery, or received by the Contractor by certified mail. c) Interruption of Public Services: No interruption of public services shall be caused by the Contractor, its agents or employees, without the engineer's prior written approval. The City and Contractor agree that in the event the City suffers damages from such interruption, the amount of liquidated damages stipulated below shall not be deemed to be a limitation upon the Cities right to recover the full amount of such damages. One thousand dollars and no cents ($1,000.00) for each day or part thereof of any utility interruption caused by the Contractor without prior written authorization. d) Survey Monuments: No land survey monument shall be disturbed or moved until the City Engineer has been properly notified and the City Engineer's surveyor has referenced the survey monument for resetting. The parties agree that upon such an unauthorized disturbance it is difficult to determine the damages from such a disturbance, and the parties agree that Contractor will pay as liquidated damages the sum of one thousand dollars and no cents ($1000.00) to cover such damage and expense.

Award

Fire / Police

$20,861.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
25
Bidding Soon
499
All Active Projects
195
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2024

November 7, 2024

img_map_placeholder

4120 W 12600 S, Riverton, UT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.