BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 6, 2024 at 7:00 PM

Updated May 6, 2025

Site work for a mixed-use development in Panaca, Nevada. Completed plans call for site work for a bridge / tunnel.

Site Address: Miller Point, Cathedral Gorge State Park Site Directions: Miller Point (37.82963871712183, -114.41338363773733), parking area on the north side of Cathedral Gorge State Park. Base Bid Description: Renovations and updates to the circulation route from the overlook to the canyon floor below. The improvements are to stairs, a bridge, landings, guard and handrails. This includes safety railings at the edges of the upper and lower canyon visitor walking trails. Contract Time:109 calendar days. Liquidated Damages: $907.00 per day. Prevailing Wages must be paid on this project.

Bid Results

Bridges / Tunnels

$1,440,900.00

Public - State/Provincial

Site Work

24

18

18

6

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
7
Bidding Soon
119
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2024

January 6, 2025

Project location map

111 Cathedral Gorge State Park Road, Panaca, NV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.